Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Centerton (AR)

Arkansas Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2017
Fire Code Version
2018 Building Code
Code List

2021 ARKANSAS FIRE PREVENTION CODE 2017 NATIONAL ELECTRIC CODE 2006 ARKANSAS STATE FUEL GAS CODE 2006 ARKANSAS STATE PLUMBING CODE 2010 ARKANSAS STATE MECHANICAL CODE 2014 ARKANSAS STATE ENERGY CODE 2021 ARKANSAS BUILDING CODE 2021 INTERNATIONAL BUILDING CODE.

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
1
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Ee Stamp Notes
Stamps not required by AHJ
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

A common permit rejection from Fire Chief is:

"Any roof plane with over 33% needs to be 36โ€ to ridge."

Any Individual roof plane with more than 33% roof coverage MUST have 36 inch ridge setbacks.

Structural & loads

Wind Speed
108
Snow Load
20
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes
Placards on panel and at meter base regarding duel feed
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
Standard
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

FIRE 2012 BUILDING 2021 ELECTRICAL 2017

Ground mount

Ground Mount Fencing Required
Situational
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Centerton (AR) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.