Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of White Hall (AR)

Arkansas Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
Fire Setback Enforced0

Codes

NEC Code Version
2017
Code List
2012 ARKANSAS FIRE PREVENTION CODE 2017 NATIONAL ELECTRIC CODE 2006 ARKANSAS STATE FUEL GAS CODE 2006 ARKANSAS STATE PLUMBING CODE 2010 ARKANSAS STATE MECHANICAL CODE 2014 ARKANSAS STATE ENERGY CODE
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
New Planset Required For Module Swap
0

Fire setbacks

Fire Setback Enforced
0
Setback Notes
Standard

Structural & loads

Wind Speed
90
Snow Load
10
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Line Side Taps,Load Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
Standard
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of White Hall (AR) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.