County of Yell (AR)
Spot something wrong?
These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.
Report a correction NEC Code Version2020
Codes
- NEC Code Version
- 2020
- Code List
2021 ARKANSAS FIRE PREVENTION CODE
2021 INTERNATIONAL MECHANICAL CODE
2009 INTERNATIONAL ENERGY CONSERVATION CODE
2018 ARKANSAS FUEL GAS CODE
2018 INTERNATIONAL FUEL GAS CODE
2020 NATIONAL ELECTRIC CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- No
- New Planset Required For Module Swap
- No
Stamps
- Ee Stamp Required On SLD
- No
- Structural Calculations Required
- No
Structural & loads
- Reducible Snow Load Allowed
- Yes
Electrical
- AC Disconnect Required
- No