Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Town of Haynes (AR)

Arkansas Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020

Codes

NEC Code Version
2020
Code List

2021 ARKANSAS FIRE PREVENTION CODE

2021 INTERNATIONAL MECHANICAL CODE

2009 INTERNATIONAL ENERGY CONSERVATION CODE

2018 ARKANSAS FUEL GAS CODE

2018 INTERNATIONAL FUEL GAS CODE

2020 NATIONAL ELECTRIC CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Structural Calculations Required
No

Structural & loads

Reducible Snow Load Allowed
1

Electrical

AC Disconnect Required
No
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Town of Haynes (AR) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.