NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2018 INTERNATIONAL EXISTING BUILDING CODE WITH AMENDMENTS

2018 INTERNATIONAL BUILDING CODE AMENDMENTS

2018 INTERNATIONAL RESIDENTIAL CODE AMENDMENTS

2018 INTERNATIONAL SWIMMING POOL AND SPA CODE AMENDMENTS

2018 INTERNATIONAL ENERGY CONSERVATION CODE AMENDMENTS

2020 NATIONAL ELECTRIC CODE AMENDMENTS

2018 INTERNATIONAL MECHANICAL CODE AMENDMENTS

2018 INTERNATIONAL PLUMBING CODE AMENDMENTS

2018 INTERNATIONAL FUEL GAS CODE AMENDMENT

2003 INTERNATIONAL FIRE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
1
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Rake Setback
54
Setback Notes

30" clearance required around rooftop AC units


Pathways must be over supported roof structure meaning setbacks start at a load bearing wall

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category C

Snow Load
0
Snow Load Notes

0

Reducible Snow Load Allowed
0
Max Attachment Spacing
96
Structural Notes


Minimum Ground On Roof
#6

Electrical

Electrical Load Calcs Required
All Jobs
Allowed POI
Load Side Taps,Meter Adapter,PV Breaker,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.82

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

When using a tap kit, provide the manufacturer's spec sheet in the plan set. We may not use class-J fuses at 60A. Please utilize conductor length.

Site


Roof Plan

Permits cannot be installed on an unpermitted or exempt permitted structure such as storage sheds.

Electrical Diagram

1 & 3 Line diagram required

Sub panels: show existing feeder size

Electrical Diagram Notes

MPU [New SES must be installed to a UFER ground or a second ground rod must be installed at least six feet apart if reading of 25 OHMs cannot be achieved on a single rod. IRC Sec E 3608.4.]

Label Page

Label needs to be added to the group that identifies the rapid shutdown switch and be placed within 3' of the switch NFPA 1 2018 SEC 11.12

Custom Placards Required
1
Non Standard Planset Requirements
Single Line Diagram

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes

AHJ does not permit Nuance racking, please ensure designs are built with Ironridge


Scrim is allowed as long as we provide the cut sheets.

See file 'Scrim' in file section below

Shade structures require a general contractor to be listed on the plans

Solar panels and associated equipment shall be installed per manufacturer’s specifications; however, if these devices are installed within the side yard setback, a minimum clearance of three feet (3’) shall be maintained from either the dwelling unit or the property line for fire access.

No portion of the solar panels and associated equipment that is installed within the established side yard setback shall exceed a height six feet above grade.

PV solar system should be 10 linear feet from existing Septic tank location.


-The actual shape and dimensions of the lot to be built upon (shown on site plan)

-The exact sizes and location of all existing and proposed buildings and accessory buildings on the lot (shown on site plan)

provide a legible elevation plan for the proposed ground mount system


Voltage drop calculations required if wire run is more than 150 ft.


This AHJ requires special inspection, which disqualifies Nuance Osprey Racking.

Ground Mount Requires Soil Sample
Soil Study
Setback Front Yard
25
Setback Back Yard
25
Setback Side Yard
10
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of Yuma (AZ) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.