Town of Gilbert (AZ)
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE 2018 INTERNATIONAL SWIMMING POOL AND SPA CODE 2018 UNIFORM MECHANICAL CODE 2018 UNIFORM PLUMBING CODE 2017 NATIONAL ELECTRICAL CODE 2018 INTERNATIONAL FIRE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Ee Stamp Notes
SRP Utility requires EE
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Date Plans are Stamped
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Snow Load Notes
NO
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
SRP Utility requires SE
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.87
Battery / ESS
- Unique Battery Placards Needed
- 1
- Separate ESS Disconnect Required
- Local Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Add Form Number to Production Meter, if using Eaton B-line 011 MS25, note callout FITS FORMS 1S, 2S Gilbert does not require a building permit for solar installation if installed by a licensed contractor so as long as you're the licensed contractor you're doing the installation of the product no plans or permit is required. Unless you are de-rating the service or replacing the service to accommodate for solar, so if you're affecting the SES then you would need a permit for that. If you're derating we need a 3-line showing the derate. If you're swapping the panel for a solar-ready panel (a like for like) we just require a permit no plans are required
- Electrical Diagram
Permits are not required unless we derate or do an MPU, so no inspection will be necessary. SEE BELOW FOR BATTERY BACK UP SLD ONLY : MAKE SURE THE DER METER AND DER STORAGE DISCONNECT ARE IN THE CORRECT ORDER. and #8AWG between the Back Up Disconnect and Backup load panel
- Electrical Diagram Notes
PCS allowed
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- No