Town of Oro Valley (AZ)
NEC Code Version2017
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2017 NATIONAL ELECTRICAL CODE AMENDMENTS 2018 INTERNATIONAL BUILDING CODE AMENDMENTS 2018 INTERNATIONAL ENERGY CONSERVATION CODE AMENDMENTS 2018 INTERNATIONAL FIRE CODE AMENDMENTS 2018 INTERNATIONAL FUEL GAS CODE AMENDMENTS 2018 INTERNATIONAL MECHANICAL CODE AMENDMENTS 2018 INTERNATIONAL PLUMBING CODE AMENDMENTS 2018 INTERNATIONAL PROPERTY MAINTENANCE CODE AMENDMENTS 2018 INTERNATIONAL RESIDENTIAL CODE AMENDMENTS
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 44944
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes - 18kW+
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes - Existing PV
- Ee Stamp Notes
Projects over 18kW DC require AZ EE stamp.
BALLASTED SYSTEM REQUIRE SS STAMPS: Have the engineer of record provide the total loads to the roof system with the ballast system and the number blocks to be used.
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- SE digital stamps on structural plan page sections 1-3. Digitally stamped SE calcs letter. Projects over 18kW DC require AZ EE stamp. Provide point load and average PSF of PV.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.87
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Roof Plan
Show location of strings on roof to match stringing on ELD
- Electrical Diagram
- 3-line and 1-line diagram required on plans
- When performing load side taps per NEC 2020 705.12(B)(2): From the point of the tap, to the point of the feeder termination, the conductor must be rated at the value of the solar output and the power source (utility). This AHJ does not allow the load side protection of feeders (Main Breaker in sub panel).
Ground mount
- Ground Mount Fencing Required
- Yes