Town of Star Valley (AZ)
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL EXISTING BLDG CODE 2018 INTERNATIONAL MECHANICAL CODE 2018 INTERNATIONAL FIRE CODE 2018 INTERNATIONAL PLUMBING CODE 2017 NATIONAL ELECTRIC CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 90
- Snow Load
- 40
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- Structural Engineering Required for manufactured homes
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Same as Payson-Make sure Star Valley is noted somewhere on documents ; WS is 90/B and snowload is 40 Note the distance of conduit above roof surface, ensure this is consistent on all pages where it is noted. If the ELD shows 7/8 max height, and the general notes says 1 max height, AHJ will issue correction.
- Roof Plan
Make sure conduit and J-boxes are shown on roof plan
- Electrical Diagram
Show minimum conductor length on SLD, see document in file section Specify AIC rating of PV breaker to comply with APS short circuit current (110.9) Specify AIC rating of Electrical Panel to comply with APS short circuit current (110.9)
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim