Town of Superior (AZ)
Codes
- NEC Code Version
- 2011
- Fire Code Version
- 2018 Building Code
- Code List
2012 INTERNATIONAL BUILDING CODE 2012 INTERNATIONAL RESIDENTIAL CODE 2012 INTERNATIONAL MECHANICAL CODE 2012 INTERNATIONAL PLUMBING CODE 2012 UNIFORM PLUMBING CODE 2012 INTERNATIONAL FUEL GAS CODE 2012 INTERNATIONAL ENERGY CONSERVATION CODE 2012 INTERNATIONAL EXISTING BUILDING CODE 2012 INTERNATIONAL SWIMMING POOL AND SPA CODE 2011 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 2
- Revision Required
- 0
- Rough Inspection
- Footing inspection
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Snow Load Notes
No snow load calcs required.
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Meter Adapter,PV Breaker,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
NEED TO SHOW MAXIMUM HEIGHT IN INCHES FROM TOP OF ROOF TO TOP OF SOLAR MODULE INCLUDE SPECS FOR MPU PROVIDE UPLIFT CALCS FROM IR DESIGNER FOR TRUSS & RAFTER FRAMING MOBILE/MANUFACTURED HOMES WILL REQUIRE STRUCTURAL ENGINEERING. NEED TO SHOW MAXIMUM HEIGHT IN INCHES FROM TOP OF ROOF TO TOP OF SOLAR MODULE INCLUDE SPECS FOR MPU PROVIDE UPLIFT CALCS FROM IR DESIGNER FOR TRUSS & RAFTER FRAMING MOBILE/MANUFACTURED HOMES WILL REQUIRE STRUCTURAL ENGINEERING Within the Town of Superior, Willdan works as the Town Engineer and Zoning Administrator. So you will need to submit site plans to us prior to any work or building permits. We usually turn these things around within a few days by issuing you a Zoning Clearance (attached).
- Electrical Diagram
SINGLE AND 3 LINE DIAGRAM REQUIRED
Ground mount
- Ground Mount Fencing Required
- No