City of Anaheim (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2022 CALIFORNIA BUILDING CODE

2022 CALIFORNIA ELECTRICAL CODE

2022 CALIFORNIA FIRE CODE

2022 CALIFORNIA PLUMBING CODE

2022 CALIFORNIA MECHANICAL CODE

2022 CALIFORNIA ENERGY CODE

2022 CALIFORNIA RESIDENTIAL CODE

2022 CALIFORNIA ADMINISTRATIVE CODE

2022 CALIFORNIA GREEN BUILDING STANDARDS CODE

ANAHEIM MUNICIPLE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
Other (See Submission Notes)
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
1

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

2018 FIRE SETBACKS

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Structural Notes


Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Load Side Taps,Meter Adapter,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

ALL ESS JOBS

  • ESS shall not be located less than 3' from doors or windows. Provide elevation drawing illustrating this
  • ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc.
  • Include Battery Attachment Elevation on elevations page.

WHEN ESS IS TO BE LOCATED IN THE GARAGE

  • A GARAGE FLOOR PLAN MUST BE INCLUDED IN THE PLAN SET TO VERIFY THAT THE ESS EQUIPMENT WILL NOT BE PLACED WITHIN THE IMPACT PATH OF A VEHICLE
  • GARAGE FLOOR PLAN MUST INCLUDE DETAIL SHOWING PARKING SPACE FOR THE VEHICLE
  • FOR EXAMPLE, A 20'X20' GARAGE (2-CAR GARAGE) NEEDS TO BE MAINTAINED AN 18-FOOT DEPTH BY 17-FOOT WIDE CLEARANCE FOR THE PARKING VEHICLES. A PARKED VEHICLE IS 18'X8'6"
  • A HEAT DETECTOR MUST BE ILLUSTRATED ON THE GARAGE FLOOR PLAN
  • INCLUDE SPEC SHEET FOR THE HEAT DETECTOR
  • INCLUDE NOTE - A LISTED HEAT ALARM INTERCONNECTED TO THE SMOKE ALARMS IN LOCATIONS WITHIN DWELLING UNITS, SLEEPING UNITS AND ATTACHED GARAGES WHERE SMOKE ALARMS CANNOT BE INSTALLED BASED ON THEIR LISTING CFC 1207.11.6.
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

ALL JOBS

  • Fill out pg. 2 of the PV Structural Criteria form the files section below and upload the completed document under the project files in Lightspeed.
  • 18"x24" paper format required (To be completed by Designer)
  • Open Plans in Adobe PDF: Go to File, select Print, Click Page Setup and change the following; Size: ARCH C, Orientation: Landscape. Print as Adobe PDF.
  • Make sure "fit to page" is selected.
  • Please flatten plans
  • Plans must be black and white
  • Spec sheets pages need to be same size and orientation as the rest of plans.
  • Only use rev clouds if changes to the plan set are made after permit issuance.

For projects less than 10KW AC

  • Fill out "Standard PV Plan - City of Anaheim PDF - upload the completed document to the project files in Lightspeed
  • QC entries on values on the standard plan, the inspector will reference this at time of inspection
  • Last page of standard plan needs the layout from the plans with minimal information (roof callouts, module callouts) we will fail inspection if we do not provide.

EV CHARGER JOBS

  • IF INSTALLING AN EV CHARGER, SPEC SHEET MUST BE PROVIDED, WE ALSO NEED TO FILL OUT EV CHARGER LOAD CALCULATIONS FORM FROM AHJ, DOCUMENT ATTACHED IN FILE SECTION
Cover Page


Cover Page Notes

All Jobs [SOLAR PANELS AND ALL OTHER ELECTRICAL EQUIPMENT BEING INSTALLED MUST BE LISTED WITH UL1703]

Site

ALL JOBS

  • Label all accessory structures on the site (pools, patio covers, structures, etc.)
  • Site plan must include ENTIRE boundary of property, and match AHJ records.
  • Site plan MUST include dimensions
  • BOS equipment must NOT BE SEEN from street view or painted to match color existing house.

MULTI UNIT HOMES (DUPLEXES, ETC.)

  • The site plan must show the boundaries of the entire parcel and specify which unit(s) we are installing on
Site Notes

All Jobs [The grade, floor or platform in the required working space shall be kept clear, and the floor grade, or platform shall be level and flat as practical for the entire width or the working space. CEC 110.26(A)(6) // Provide #8 bond wire to metal gas pipe and hot and cold water pipe. CEC 250.104]

Attachment Detail

Specify height of panel from roof. Cannot exceed 8".

Electrical Diagram


Electrical Diagram Notes

All Jobs [120% rule allowed per 2025 CEC 705.12(B)(2)(3)(d) // AC DISCO to be within 3' of utility meter on exterior of building and not behind a fence or gate.]

Custom Placards Required
1
Placards Notes

City requires their own placards, please see sheet uploaded below. The values will change depending on the job. This will be filled out with the Standard plan and will be in your permit packet for this AHJ to order placards.

Non Standard Revision Requirements
  • Clouds & Deltas shall be used only for revisions after permit issuance.
  • Pages in the plans must stay in the EXACT same order that they were originally submitted to the AHJ in. This means that any pages removed from the plans must be replaced with a blank page, and any additional pages added to the plans after the initial permit submission must be added to the very back of the set behind the spec sheets.
  • Revision letters must be uploaded separately from the plans

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Anaheim (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.