City of Barstow (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45943
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 3
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- Yes - Derate,Yes - Relocated loads
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Ee Stamp Notes
PV checklist to be completed. This waves stamps needed. If no checklist we need both electrical load calcs and structural load calcs. Exception: derates and load relocations will require EE load calcs/stamp even with the checklist completed.
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 5
- Snow Load Notes
N/A
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
PE Requirements; PV checklist to be completed. This waves stamps needed. If no checklist we need both electrical load calcs and structural load calcs. (If applicable) SE digital stamps on corresponding PV pages & PE Letter / S Calcs. WS 110 MPH Exposure Category C , GSL 5 PSF
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates,Load Relocation
- Allowed POI
- PV Breaker,Load Side Taps,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 1
- ESS Notes
Standard
ESS disconnect required within 6ft of Battery on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- Local Disconnect,ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
PV checklist to be completed. This waves stamps needed. If no checklist we need both electrical load calcs and structural load calcs.
- Electrical Diagram
Existing EV chargers MUST be on SLD. Will not allow two points of interconnection. If there is an existing system it must be combined before connecting in the MSP. If uffer cannot be identified, two ground rods must be installed and water/gas metal piping to be bonded. Surge Protection Device required per NEC 230.67/230.85. Please add requirement as note on electrical plans. RSD to be in line of sight from MSP
- Custom Placards Required
- 0
- Non Standard Planset Requirements
- Single Line Diagram
- Non Standard Revision Requirements
For all revisions/corrections Changes made to the plans must be clouded and labeled as Deltas, and the title page needs to have a full description of what the changes/revisions are. In the title page we must also state the pages in which the changes/revisions are located at.
Ground mount
- Ground Mount Fencing Required
- Yes
- Ground Mount Notes
If the location of the groundmount has 3 walls that screen the groundmount from view from street, a fence is not required. P.E. Stamp is required for groundmounts
- Setback Side Yard
- 5