City of Benicia (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 44495
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 3
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Electrical,Digital Structural
- Structural Calculations Required
- Yes
- Ee Stamp Notes
EE digital stamps on residential load calcs and ELD.
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
PE Requirements; SE digital stamps on corresponding PV pages & PE Letter / Calcs.
Do you require structural calculations for residential solar? Depending (a past project approved w/o structural calcs/stamps and is a "truss". Per structural criteria, trusses are limited to 4' so it appears AHJ ignores this part. Sending a past project & Christine w/o calcs to confirm trusses do not need structural) a past project & Christine (trusses) were approved without structural.
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- All Jobs
- Allowed POI
- Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Add Tri-Power Source label
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Electrical Load Calcs needed for all projects. Standard - Just fill out structural criteria uploaded below.
The City of Benicia now requires EE stamped load calcs and stamped SLD for Center Fed mains.
- Electrical Diagram
120% rule allowed per CEC 705.12(B)(2)(3)(d)
- Electrical Diagram Notes
Provide information on the MSP. Size of buss bar in amps, is there a main OCPD, if so what size, if not is it a hot buss panel.
In the electrical diagram show the point of connection, how the point of connection is being made, along with the necessary calculations. CEC705.12.
Show compliance with CEC 707.16(F) Stand-Alone Operation/710.15(F) Back-fed Circuit Breakers/408.36(D) Back-Fed Devices. Show the required additional attachment for the breakers.
Show the maximum size of the load that may be backed up. Show compliance with CEC 707.16(F) Stand-Alone Operation/710.15(A) Supply-Output.
- Custom Placards Required
- 1
- Placards Notes
If multiple ESS onsite - special placards need to name batteries as 'Battery 1' 'Battery 2' etc
Ground mount
- Ground Mount Fencing Required
- Situational