City of Chico (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Testing
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 3
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
- Ee Stamp Notes
- Stamp Needed for Main Breaker Derate
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 105
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Snow Load Notes
N/A
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- On top of a residence, no. For a ground-based system or on a newly built structure over parking, yes.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Line Side Taps,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
9540A accepted - manufacturer required spacing between batteries is allowed.
Include this note on ELD - [Producer's storage device(s) will not cause the Host Load to exceed its normal peak demand. Normal peak demand is defined as the highest amount of power required from the Distribution System by Producer's complete facilities without the influence or use of the energy storage device(s)]
Provide "ENERGY STORAGE DISCONNECT" Plaque on each ESS system disconnect per CEC 706.15 (C).
Provide Mounting details for Battery.
Provide an elevation of the wall showing the battery locations including distances from any doors or windows
Batteries shall not be installed under a window
Batteries shall be at least 3' horizontally from any door or window
Provide a clearly labeled disconnect device for the batteries on the exterior wall of the residence. a breaker cannot be used for the required disconnect if possible, locate the disconnect near the msp.
The disconnect shall be located a minimum of 5 ft from the batteries
Interior ESS installations:
- Provide overhead view of garage to show impact / non-impact areas and where the ESS will be located.
- Provide note: HEAT ALARM WILL BE INTERCONNECTED TO THE SMOKE ALARMS IN THE HOME AND INSTALLED PER MANUFACTURER'S INSTRUCTIONS.
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes
Plan set
- Plan Set Requirements
Racking spec sheets must include the UL Listing
- Electrical Diagram
no fault studies/load calcs required single line diagram required
MPU - Provide surge protection on new main panel per California Electrical Code (CEC) 230.67.
EXISTING SOLAR MUST BE REFLECTED THROUGH OUT PLANS AND ELECTRICAL CALCS IF PRESENT ONSITE
- Custom Placards Required
- 1
- Placards Notes
We only need placards if inverter is not in line of site of main service panel
- Non Standard Planset Requirements
- Single Line Diagram
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
03/09/21 SJ - Must fill out ESPC worksheet for GM's per a past project correction. Uploaded to file section below.