City of Chula Vista (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45098
Any SolarAPP+ Restrictions
1
SolarAPP+ Restriction Notes

Solarapp is not available for multifamily buildings

SolarAPP+ Restrictions
Existing Systems,Trenching,Other
How Many Plansets Required
3
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
1

Stamps

Ee Stamp Required On SLD
Yes - 10kW+,Yes - Derate
Wet Stamps Required
None
Structural Calculations Required
Yes - 10kW+
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

3' clearance around chimneys and overhead service.

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category C

Snow Load
0
Snow Load Notes

N/A

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

AC Disconnect Conditional Criteria
If the inverter is behind a fence/interior, a second AC disconnect shall be placed within sight of the inverter.
Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,Line Side Taps,Meter Adapter,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
1
ESS Notes

Battery system must be shown on placard. Battery system needs Battery Disco.

Group disconnects together.

Provide mounting detail for the battery.

This must include: Exterior wall finish construction (if exterior mounted)

Distance from ESS to openings (doors, windows, vents) and eaves Must be 3' or greater.

Distance from ESS to MSP, gas meter, water heater. Must be 6' or greater.

Distance from ESS to other ESS and/or disconnects. Must be 5' or greater.

Disconnect within line of sighed of ESS and no closer than 5' away from ESS

If the ESS is subject to physical damage (ex. motor vehicles) it shall be protected with an approved barrier system, such as bollards.

Provide a 5' pathway with no obstructions from the street to the ESS or two 3' pathways.

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc

If ESS is not located by the MSP, two ESS discos will be required to fulfill all of these requirements.

11/27 IF BATTERY IS LOCATED INSIDE THE GARAGE A HEAT DETECTOR SHALL BE INSTALLED INTERCONNECTED TO EXISTING SMOKE ALARM. ADD NOTE IN SITE PLAN: [BATTERIES ARE LOCATED IN GARAGE AND WILL REQUIRE A HEAT DETECTOR BE INSTALLED]

Separate ESS Disconnect Required
Local Disconnect,ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

ALL JOBS:

  • SPECIFIC TITLE BLOCK FORMATTING IS REQUIRED. THE PAGE NUMBERING MUST BE ENLARGED. SEE PROJECT ---> 549709 <--- FOR REFERENCE ON HOW TO DO THIS
  • Must include Streamlined Packet if the project is 10kw or LESS, and NOT an add on system OR a multifamily home (duplex, etc). (Blank uploaded to the files below).
Cover Page

INCLUDE NOTES ON COVER PAGE (DELETE WHAT DOESN'T APPLY)

  • BUILDING OCCUPANCY TYPE - R2 (TOWNHOUSE, APARTMENT COMPLEX) OR R3 (SINGLE FAMILY DWELLING)
  • FIRE SPRINKLERS PRESENT ON SITE - YES / NO
  • NUMBER OF STORIES
Cover Page Notes

MPU [SDGE work order shall be available on site at time of inspection]

Site

ALL JOBS

  • Must show property dimensions on site plan.
  • PV disconnecting means shall be located at a readily accessible location
  • If the inverter is behind a fence/interior, a second AC disconnect shall be placed within sight of the inverter.
  • For duplexes and similar multi-unit homes, show on the roof the boundaries of the unit(s) we are installing on.

BATTERY JOBS:

  • Site plan must show 5' clear path from street to ESS
Attachment Detail

FLAT ROOF

  • List the height of parapet walls on flat roofs (if any) in the plans. If array taller than the parapet wall, additional calculations required.
Electrical Diagram


Electrical Diagram Notes

MPU [SDGE work order shall be available on-site at the time of inspection // All services supplying dwelling units shall be provided with a surge-protective device (SPD) at the main service panel of the 2025 California Electrical Code]

Label Page

ALL JOBS:

  • HOUSE MODEL MUST ALWAYS BE ORIETNTED SO THE MSP IS ON THE BOTTOM

BATTERY OR EXISTING SYSTEMS:

  • TRI POWER SOURCE LABEL REQUIRED
Custom Placards Required
1
Placards Notes

Required for all jobs

  • PLACARD: ROTATE PLACARD SO THE MSP IS ALIGNED WITH THE BOTTOM
  • Directional placard shall be oriented relative to where an individual will be standing looking at the placard. Meter panel to be at the bottom of placard when oriented correctly.

Ground mount

Ground Mount Fencing Required
Situational
Ground Mount Notes

GM setbacks vary with each property according to AHJ

Please specify the ICC approval number of equal for the ground mount system or provide structural calculation by California licensed civil engineer.

Please specify the required foundation pier depth

Show how you intend to limit accessibility of children to exposed module wiring on ground mounted PV arrays.

Please provide statement (narrative) on plans addressing this issue.