City of Corona (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Testing
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,MPU,Derate,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Electrical,Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
For each roof plane with a photovoltaic array, not fewer than on 36-inch wide pathway from the lowest roof edge to ridge must be provided on the same roof plane as the array, on an adjacent roof plane, or straddling the same and adjacent roof planes.
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Snow Load Notes
N/A
- Reducible Snow Load Allowed
- 0
- Max Attachment Spacing
- 96
- Structural Notes
For Existing system: Provide structural calcs signed by PE considering the load for both systems (total loads of existing & New)
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- All Jobs
- Allowed POI
- Line Side Taps,Load Side Taps,Meter Adapter,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Battery jobs require special placards.
If Battery is installed in the garage, the ESS disco should also be in the garage.
Elevation drawing of wall where equipment will be hung is required on all ESS projects.
Add notes to SLD/Site plan: [EXTERIOR ESS UNITS WILL NOT BE INSTALLED WITHIN 5β (IN ANY DIRECTION) OF ALL WINDOWS, DOORS, AND HVAC INLETS.β βESS UNITS WILL BE INSTALLED NO LESS THAN 3β FROM OTHER ESS UNITS.]
ESS disconnecting means shall be readily accessible, shall be located within site of the ESS, and shall be installed as close as practicable.
Heat detectors required for ESS installed in attached garages where smoke alarms cannot be installed. Call out installation of heat detectors on plans when applicable.
- Separate ESS Disconnect Required
- Local Disconnect,ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
ALL JOBS
- Show compliance that the PV System's fire classification must be class A roofing material per sections R902.3 pr R904.4
- All equipment shall be listed and labeled by a recognized testing laboratory. Provide documents that the racking conforms to and are listed under UL 2703. Provide documents that inverter is listed under UL 1741
- For Projects under 10KW, Fill out Eligibility checklist, Structural Criteria, and Standard Plan. (Attached below). Expedite packet, not required for jobs with an existing system. Structural Criteria packet not required when using truss
- Structural Criteria (required for design to complete) packet allows 6' anchor spans for Rafters ONLY. Rafters will pass without site specific engineering. Framing. Order structural stamps to span 6' for plated wood trusses
- Attach documentpv_power_source_labeling.pdf to every single plan set.
MPU
- Provide spec sheet for new main panel
EXISTING SYSTEM
- Provide structural calcs signed by PE considering the load for both systems (total loads of existing & New)
- Provide permit # for existing solar system (this can be obtained via permit research ticket)
EV CHARGER
- Panel schedule required.
- Electrical load calcs required. Clarify all the loads and consider the EV charger.
- The coupling means shall be stored or located at a height of not less than 450mm (18in) above the floor level for indoor locations and 600mm, 924in) above the grade level for outdoor locations.
- Equipment shall have a listed system of protection
- Clarify if you hardwired the charger or using receptacle
- Add spec sheet for specific generation of EV Charger
SUB-PANEL
- Clarify number and size of wires relocated from main panel to load center panel
- Clarify conduit size used to relocate the wires and % of conduit fill
- Must provide load calcs and panel schedule specifically for the sub panel
#NFZ_ALL
- Cover Page
State on cover page:
Occupancy
Sprinkled Yes or No
Construction Type V-B
- Cover Page Notes
All Jobs: [The panels are not reflective and will not cause glare to cars passing by // Photovoltaic system's fire classification must be class A roofing material per sections R902.3 or R904.4 // Photovoltaic system's installation shall be per the manufacturers installation instructions. // Smoke and carbon monoxide alarms must be installed per the California residential code and verified prier to find inspection approval]
- Roof Plan
- Show total percentage of roof coverage of arrays. Include existing systems, if applicable
- Ladder/Roof access needs to be noted on PV 2A
- Electrical Diagram
ALL JOBS
- Clarify the way of connecting 2 different systems and the way they are compatible to each other signed by a CA professional engineer.
- Clarify the way of your system comply to CEC 705.12 and provide calculation. Clarify the way of connection 3 wires to the main panel.
- Clarify the initiation device and clarify the way to rapid shutdown at the systems with the location
- AN OVERCURRENT PROTECTIVE DEVICE THAT IS POSITIONED 2'-3' FROM THE METER PANEL (USING LIQUID TIGHT FLEXIBLE CONDUIT)
- Load calcs required if relocating loads
BATTERY JOBS
- ESS Disconnect Requirements: readily accessible, within sight of ESS, lockable open
- For SEEB Projects: Utilize 100A AC Disconnect for 63A CHINT breaker.
- Label Page
Existing systems:
- If the (E) and (N) systems have different Rapid Shutdown types, diagram of the roof shall be provided showing each different PV system and a dotted line around areas that remain energized after the rapid shutdown switch is operated.
- Custom Placards Required
- 1
- Non Standard Revision Requirements
Response letter must contain a numbered response to all rejection comments from the AHJ
Ground mount
- Ground Mount Fencing Required
- Yes