Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Eastvale (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45007
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
2
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
Yes - Battery,Yes - Existing PV
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

PV arrays shall be located at least 2h2 (2 times the maximum height of the modules above roof deck) from the roof edge, a gable ridge or a hip ridge

Structural & loads

Wind Speed
102
Wind Notes

Use ASCE7-16 , 26.5.1. Exposure Category C

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes
Standard
Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96
BOS Restrictions

If the inverter is located inside, disconnecting means shall be provided within sight and within 10ftΒΈ of the equipment 690.15(A). 2nd AC disconnect is required when inverter is not within line of sight of MSP

Internal TPW switch can serve as 2nd disconnecting means.

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

If storage is installed garage, vehicle impact protection should be noted on plans

 Provide a note on the plan that the battery is not to be located within 3 feet of a building opening

ESS disconnect required within 6ft of BATTERY on same wall and not blocked by walls/gates/etc

Separate ESS Disconnect Required
Local Disconnect,ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

When the City states anything else other than Eastvale, change to Eastvale.

Please provide the Manufactures Cut Sheets for all of the equipment in the system including the racking system

Include solaredge documentation "PV Power Source Labelling" PDF uploaded below * Include "SM_Insallation_UL2703" PDF uploaded below

Cover Page

*Indicate occupancy group (R3 for installing on a residence, U if installing on a miscellaneous structure like hangars, barns, garages, stables, sheds, & other farm buildings) * indicate a fire sprinkler system YES or NO

Cover Page Notes

All Jobs [Seismic Design Category: D2 // the installer LLC SHALL INSTALL THE PROPOSED PV SYSTEM // BUILDING TYPE CONSTRUCTION VB]

Site Notes

All Jobs [All new electrical equipment is to be no closer than 3 feet from the gas riser]

Roof Plan

Show wind speed and exposure category on roof plan or roof details page

Roof Plan Notes

All Jobs [EMT shall be securely fastened in place at intervals not to exceed 10’-0”. In addition, each EMT run between termination points shall be securely fastened within 3’-0” of each outlet box, junction box, device box, cabinet, conduit body, or other tubing termination.]


All Jobs [PV arrays shall be located at least 2h2 (2 times the maximum height of the modules above roof deck) from the roof edge, a gable ridge or a hip ridge]

Attachment Detail

Call out max attachment span in both directions. Provide span tables for the racking system. The layout shall coordinate with the span tables. Specify rail size. Detail support mechanism used to connect EMT on/across the roof. The support mechanism shall accommodate a 1” min. clearance from the roof surface to the EMT and secured by an approved method.

Electrical Diagram Notes

All Jobs [ INVERTER EQUIPPED WITH INTEGRATED ARC FAULT PROTECTION. REVIEW INVERTER SPECIFICATIONS FOR FURTHER INFORMATION // EXISTING AND NEW EQUIPMENT RATED FOR 10K AIC // PV SYSTEM IS EQUIPPED WITH INTEGRATED DC GROUND FAULT PROTECTION IN COMPLIANCE WITH CEC 690.41(B)(1) & 690.41(B). REFERENCE INVERTER SPECIFICATION FOR FURTHER DOCUMENTATION // GROUNDING ELECTRODE CONDUCTOR & BONDING JUMPER TO BE SIZED #8AWG THWN-2 // NEW ELECTRICAL SHALL BE LOCATED AT LEAST THREE (3) FEET FROM GAS METER OR GAS SHUT-OFF VALVES. CPC1208.7.1; CEC 110.26 // GROUNDING ELECTRODE CONDUCTOR SIZED PER 2025 CEC TABLE 250.66.]

Label Page

Where multiple sources supply the building, the plaque or directory shall be marked with the wording "CAUTION: MULTIPLE SOURCES OF POWER"

Custom Placards Required
1
Placards Notes

Permanent main site placard + disconnect/BOS placards as listed on placard sheet of plans

Ground mount

Ground Mount Fencing Required
No
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Eastvale (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.