City of Encinitas (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45180
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching,MPU,Derate
How Many Plansets Required
3
Revision Required
1
New Planset Required For Module Swap
1

Stamps

Structural Calculations Required
No

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Demonstrate a 36" pathway for each plane with a PV array.

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category C

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes
* STRUCTURAL CALCS ONLY FOR GROUND MOUNT
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Accepts 9540a, reduced battery spacing

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

AHJ wants us to provide a filled SOLAR PV STANDARD PLAN SIMPLIFIED CENTRAL/STRING INVERTER SYSTEMS SOLAR PHOTOVOLTAIC ROOFTOP INSTALLATIONS 10 KW OR LESS, ONE- AND TWO-FAMILY DWELLINGS - All future projects must include this packet. ROOF MOUNT: Needs a diagram showing the elevation of the house from the ground to the roof and then from the ground to the top of the panel Include on plans basic wind speed of 110MPH (3-second gust) and wind exposure for the site. ROOF MOUNTED SYSTEM DO NOT REQUIRE STRUCTURAL ELEVATION IS NEEDED. DIMENSIONS FROM GRADE TO TOP OF ROOF AND FROM GRADE TO TOP OF MODULE AHJ Allows Ballasted systems

Site

If installing on a duplex, the site plan should clearly show property lines dividing the homes and notate the address of each home so that there is no confusion which address is being installed on and that no panels are being placed on a neighbor's roof.

Electrical Diagram

Standard

Custom Placards Required
1
Non Standard Planset Requirements
BOS Elevation

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes

* Ground Mounts require structural calcs * Ground Mounts: 5' side yard setback from property line. Setback requirements are uploaded below. * NOTE ON SITE PLAN: NO VEGETATION TO BE WITHIN 10 FT OF GROUND MOUNT * STRUCTURAL CALCS ONLY FOR GROUND MOUNT

Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Encinitas (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.