City of Gilroy (CA)

California Authority Having Jurisdiction Solar permitting requirements

Spot something wrong?

These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.

Report a correction
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback EnforcedYes

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
44782
Any SolarAPP+ Restrictions
Yes
SolarAPP+ Restrictions
Existing Systems,Trenching,Derate
How Many Plansets Required
1
Revision Required
Yes
Rough Inspection
None
New Planset Required For Module Swap
Yes

Stamps

Ee Stamp Required On SLD
Yes - Derate
Wet Stamps Required
None
Structural Calculations Required
No
Ee Stamp Notes

EE stamp needed for Main Breaker Derates

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
Yes
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
Yes
Max Attachment Spacing
96
Structural Notes
Structural Calcs: Only needed if it's an elevated mount, not needed for flush mounts.
Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
No
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

120% rule allowed per CEC 705.12(B)(2)(3)(d) - 1/17/20 KDA Line and load side taps are allowed, we need to provide cut sheets.


If EV charger is included, include a set of EV charger only plans

Electrical Diagram

120% rule allowed per CEC 705.12(B)(2)(3)(d)

Custom Placards Required
Yes
Placards Notes

Hard Stickers and Placards for every job

Ground mount

Ground Mount Fencing Required
No