City of Hanford (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
3
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Top Right
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes
  • A Pathway not less then 36" wide shall be provided to the Emergency escape and rescue opening. CRC 324.6.2.2
  • There shall be not less than 30" CLEARANCE AROUND ROOF TOP MOUNTED HVAC

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Snow Load Notes

N/A

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
1
ESS Notes
  • Provide section view showing ESS location.
  • Maintain 3 ft minimum clearance from habitable doors and windows.
  • Show installation height above finished floor.
  • Show distance from nearby walls and mounting hardware.
  • Maintain 3 ft minimum separation between ESS units unless supported by: Large-scale fire testing per California Fire Code Section 1207.1.5 & Provide UL 9540A test report when reduced spacing is used.
Separate ESS Disconnect Required
Local Disconnect,ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

All Projects

  • Provide 30 in minimum clearance around rooftop HVAC equipment for cleaning, maintenance, and replacement per CMC 304.1 (2016).
  • Install 10-year battery-powered smoke and carbon monoxide alarms in each sleeping room and outside each sleeping area near bedrooms per CRC 314 & 315.
  • Bus certifications are not accepted without UL field testing.

Battery Projects

  • Provide manufacturer installation instructions
  • Provide manufacturer anchorage details.

EV Charger

  • A separate set of plans showing the EV Charger only.
Site Notes

Battery [ESS working spaces must comply with CEC 110.26 and CEC 110.34] 

Electrical Diagram
  • 120% rule allowed per CEC 705.12(B)(2)(3)(d)
  • AC Disconnect not required as long as PV equipment is installed next to MSP. (Utility may require disconnect)
Label Page

Battery Projects

  • Battery Disconnect: Add warning label - WARNING - ELECTRICAL SHOCK HAZARD. TERMINALS ON THE LINE AND LOAD SIDE MAY BE ENERGIZED IN THE OPEN POSITION.

Include ESS electrical signage showing:

  • Nominal AC voltage (ESS Disconnect - Nominal Voltage: ___ VAC)
  • Maximum DC voltage (Max ESS DC Voltage: ___ VDC)
Custom Placards Required
1
Placards Notes
  • Placards are not required if all electrical equipment is grouped together.
  • Placards are required if any part of the BOS (e.g., inverter or battery) is located away from the MSP or hidden, such as in a garage.

Ground mount

Ground Mount Fencing Required
No
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Hanford (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.