City of Imperial Beach (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,MPU,Derate,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
AHJ is now requesting PE calcs for residential projects.SE digital stamps on corresponding PV pages & PE Letter / Calcs.WS 110 MPH/ EXPOSURE CAT C
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Load Side Taps,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
The city requires that no conduit be ran through any 3' fire access path ways. Use internal conduit runs with discretion Flat roofs are OK without internally ran conduit.
- Roof Plan
****The city requires that no conduit be ran through any 3' fire access path ways. Use internal conduit runs with discretion**** ~~ ** **~~Per building official, staff, Imperial Beach _ **does not strictly require conduit to be ran through the attic**_. The only restriction they had was to not run our conduit through any of the 3' fire accesses on the roof. Use internal conduit runs with discretion. Flat roof homes (anything below 2:12) with or without parapet walls do not required internally ran conduit. CONDUIT TO BE RUN IN ATTIC @ 18" MINIMUM BELOW ROOF DECKING
- Electrical Diagram
Conduits may not pass through the fire accessways so most of the conduit should be located in the attic space 18โ or more below the roof deck.
Ground mount
- Ground Mount Fencing Required
- No