City of Jurupa Valley (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 3
- Revision Required
- 1
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- Yes - 10kW+,Yes - Derate
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Ee Stamp Notes
- EE stamp required for systems over 10kW
- EE stamp required for derates
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Review the installation address on a map
West of Van Buren blvd = 130 mph
East of Van Buren blvd = 110 mph
All Regions = Exposure Category C
- Snow Load
- 0
- Snow Load Notes
N/A
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
- ASCE Design Hazards Report showing wind and snow hazards is required
- MUST INCLUDE BATTERY MOUNTING CALCULATIONS ON STRUCTURAL CALCS
- Any project the pertains to the City of Jurupa Valley, must have a Jurupa Address on it. Even if Google Maps says otherwise. Project address CANNOT reflect City of Riverside, Eastvale or Mira Loma even if that's the address that appears on Google. If the project is located within zip code 92509, or 91752 it belongs to city Jurupa Valley
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
All Jobs
ESS disconnect required within 6ft of Battery on same wall and not blocked by walls/gates/etc
Cover page must have a brief scope of work regarding battery system details -- Example:
Battery: Manufacturer
Capacity: __kW (charge rate) __kWh (capacity)
Purpose: Whole Home Backup/Partial Home Backup/Self-Consumption (Non-Backup)
Include sub panel details if applicable (i.e. (N) 125A SUB PANEL)
Backup
- Backup Load Panel MUST be labeled 'sub panel'
- Include sub panel in scope of work (Title Block)
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
Some addresses MUST be manually updated to reflect Jurupa Valley
Any project that will be submitted to City of Jurupa Valley, must have a Jurupa Address on it. Even if Lightspeed, or utility bill shows another city.
- Project address CANNOT reflect City of Riverside, Eastvale or Mira Loma if submitting to Jurupa Valley.
- If it falls in zip code 92509, or 91752 it belongs to city Jurupa Valley
- This must be updated on all areas that reflect the address (Vicinity map, title block, etc.)
Address in both plans and structural calculations must match, and show Jurupa Valley
- Cover Page
APN must be listed on title block
Must include brief Scope of Working showing proposed system details
System size
MPU rating & main breaker rating (if applicable)
- Site
All structures must be clearly labeled
- Roof Plan
ENHPASE
Must show micro-inverters on each panel
Call out combiner panel location
Existing systems
THE LAYOUT OF EXISTING PV SYSTEMS NEED TO BE ILLUSTRATED AS INDIVIDUAL MODULES, NOT ONE BIG 'OBSTRUCTION'
- Layout of modules needs to be replicated in Aurora before downloading DXF
The AHJ requires (E) system details to be accurate to their records, ensure we have detailed information about the (E) system before proceeding
- Module, Inverter (type, wattage, qty)
- If (E) system uses micros, we must show that on the roof plan
The module coverage calculation must include existing systems (if applicable)
- Attachment Detail
West of Van Buren - Use 4' o.c. attachment spans
- Electrical Diagram
MPU
Include the (E) and (N) Service Panel Amperage, to show what we are upgrading from
The AHJ requires (E) system details to be accurate to their records, ensure we have detailed information about the (E) system before proceeding
- Module, Inverter (type, wattage, qty)
- Include accurate wiring illustration of (E) system
- Electrical Diagram Notes
- Custom Placards Required
- 0
- Non Standard Revision Requirements
- Clouding/Deltas/Revision letter MUST ONLY pertain to the most recent changes. We cannot include clouds or notes about previous changes.
- Revision letter must specifically state changes made.
- Cannot use abbreviations like BOS, etc.
Ground mount
- Ground Mount Fencing Required
- Yes
- Ground Mount Notes
Ground Rod Required at ground mount panel installation. Please add to plan on single line and three line diagram