City of La Habra Heights (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
SE / EE digital stamps on all PV pages & PE Letter / Calcs. ALL SHEETS of plans and cover sheet of any calculations must be wet signed (electronic is OK) and dated by the person responsible for their preparation Provide complete layout for attachment of panel to the roof. Provide structure calcs to verify the adequacy of roof framing.
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
AC disconnect is required to be in the line of sight of the main breaker and within 10ft.
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Note/Detail on plans that the ESS shall be 3' minimum away for doors & windows into the dwelling
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
- Note on Plans: All PV equipment shall be listed by a recognized testing lab
- Provide documentation that the modules are Type 1, Type 2, Type 3 or Type 10 to meet Class A roof classification when installed with the racking system
- 12/5/24 to prove the Class A roof classification add solarmount installation manual to planset
- Roof Plan
* Show the required working clearances around the service meter main, AC Disconnect, Inverters and DC Disconnects. * Show the layout of PV mounting locations
- Attachment Detail
- Identify and show method of sealing the roof penetrations
- Provide layout of rails and attachment point to the roof
- Provide detail for mounting conduit bottom a minimum 7 /8" above the roof to omit the temperature adjustment factor for the feeders
- Electrical Diagram
Standard
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- Situational
- Ground Mount Notes
Ground Mounts: Fencing will only be required if the yard is not fenced.