City of Laguna Hills (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching,Derate
- How Many Plansets Required
- 3
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
- BOS Restrictions
Single POI in MSP required.
Battery / ESS
- Unique Battery Placards Needed
- 1
- ESS Notes
Battery system must be shown on placard. Battery system needs Battery Disco. No published information about battery placement.
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
Local disconnect = One disconnect by the batteries (line of sight)
ESS Disconnect = One disconnect by the MSP (line of sight)
If battery is in the garage, provide a fused disconnect at the battery sight.
For garage mounts: Provide a note stating: "A heat detector, paired up with the required smoke detectors throughout the home, shall be installed in the garage for the proposed ESS batteries."
- Separate ESS Disconnect Required
- Local Disconnect,ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Roof Plan
Array roof coverage calcs must include both new and existing PV
- Electrical Diagram
120% rule allowed per CEC 705.12(B)(2)(3)(d)
- Label Page
FOR BATTERY + EXISTING SYSTEMS:
Include tri-power source label. Sources: Utility Grid, Battery and PV Electric System
R328.11(2): Provide a label on the installed ESS containing the contact information for the qualified maintenance and service providers.
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim