City of Lakewood (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45932
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 1
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes - Attachment Spacing > 4ft,Yes - Non-Comp Shingle
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Conditional Criteria
- Electrical disconnect for the unit shall be within line of sight and readily accessible
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Whole Home Backup
- Service Ground Requirements
HE CONNECTION TO THE INTERIOR METAL WATER PIPING SHALL BE MADE WITHIN 5 FT FROM THE POINT OF ENTRANCE
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
[LACOF]
This AHJ follows County of Los Angeles (ESS Requirements) (CA).
Please follow this link to County of Los Angeles (ESS Requirements) (CA)
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- Local Disconnect,ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Roof Plan
Minimal run conduit outside - must be ran through attic
- Electrical Diagram
**FOR MPUs:** * Specify if MSP is fed by an overhead drop or underground feed. If overhead, provide the size of the service entrance conductors. * Identify GEC size to Table 250.66 (https://www.electricallicenserenewal.com/Electrical-Continuing-Education-Courses/graphics/sectionPics/small/qid867.jpg). * Cold water within 5' and at least 1 supplemental electrode are required. (03/24/2021 HB - Testing a past project DCR if drawing in a generic detail satisfies this.) * Metal Underground Water Pipe: leave a note saying "THE CONNECTION TO THE INTERIOR METAL WATER PIPING SHALL BE MADE WITHIN 5 FT FROM THE POINT OF ENTRANCE." * Indicate type of grounding electrode per sections 250.52(A)(1)-(A)(7) if available. **TAPS** * on the ELD, note the distance from the fused disco to the tap. See file named "Tap note" in the file section below for reference. **Existing Systems** * Must show all system info on SLD, including equipment and conductor information
- Electrical Diagram Notes
All Jobs [THE CONNECTION TO THE INTERIOR METAL WATER PIPING SHALL BE MADE WITHIN 5 FT FROM THE POINT OF ENTRANCE. // Electrical disconnect for the unit shall be within line of sight and readily accessible]
- Label Page
USE 2017 LABELS
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim