City of Lemoore (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- Other (See Submission Notes)
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
SE stamps on corresponding PV pages & PE Letter / Calcs. WS 110mph. Exposure B. * 12/02/20 - City of Lemoore - Inspector / Plan checker doesn't want to approved GMA projects. Inspector will only approved pv plans with GMA if we can provide a Singed PG&E Approval Letter. He said just do an MPU. - Jess H * if installing on a patio cover, structural is required.
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Load Side Taps,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
AC Disconnect must be located within line sight of MSP and within 10' of MSP
Battery / ESS
- Unique Battery Placards Needed
- 1
- ESS Notes
Producers storage device(s) will not cause the Host Load to exceed its normal peak demand. Normal peak demand is defined as the highest amount of power required from the Distribution System by Producers complete facilities without the influence or use of the energy storage device(s). - The customers solar generating system, including an energy storage system if installed, connected to the GMA, will have no more than a maximum rating of 14.0 kilowatts (kW) at 240 volts (V) and does not produce a total of more than 60 amps
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
ll zinscos panels in Lemoore is automatic MPU. MC Please do not place mods over O'hagen vents when designing or in the CR process. This has failed inspection Please do not place mods over O'hagen vents when designing or in the CR process. This has failed inspection
- Electrical Diagram
Standard
- Custom Placards Required
- 1
- Placards Notes
- SPECIAL PLACARD - AHJ REQUIRES PCS SETTING FOR ALL TESLA POWERWALL JOBS
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim