City of Needles (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
3
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
None
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

* They have adopted the new CalFire 2018 code affecting the setback rules.

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category C

Snow Load
5
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Load Side Taps,Line Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

CE is to fill out the City of Needles Checklist, Standard Plan (Central Inverter or Micro, not both) and Structural criteria. Upload documents in Lightspeed files section as Other - CE - AHJ/Utility Forms when you upload plans

Cover Page

Please clearly indicate the scope of work on cover sheet. - outside of the Title box

Roof Plan Notes

Please provide a note stating that PV arrays shall be located at least 2h2 (2 times the maximum height of the modules above the roof deck) from the roof edge, a gable ridge, or a hip ridge. (ASCE 7-16 29.4.4).


Please add a note that Modules are to be 2 minimum and 10 maximum from roof deck. 


Please provide anchorage calculations.

Electrical Diagram

Standard

Ground mount

Ground Mount Fencing Required
Mesh/Scrim