City of Palo Alto (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 44655
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restriction Notes
- No PV+ST
- SolarAPP+ Restrictions
- Existing Systems,Trenching,Historic District,MPU,Derate
- How Many Plansets Required
- 3
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
AC/DC wire calcs required
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.87
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Provide Ironridge span chart If the site is next to a body of water (lake, creek, etc) an elevation plan is required to show that exterior equipment will be installed 1 ft above base flood elevation.
- Roof Plan
Ballast and tilt-up panels with more than 18 from roof surface will require structural calcs. Structural engineering may be required on a case by case basis from AHJ.
- Attachment Detail
double flashing required
- Electrical Diagram
120% will be approved - but will have longer turn around time and a one time fee to submit ac disconnect required 2nd ac disconnect if not within line sight Clearly, indicate on the plan whether the microinverters are integrated grounding type or the earlier generation type which requires a grounding electrode conductor connection.
- Label Page
Ensure the placard is in accordance with pages 12-15 of the PV handout https://www.cityofpaloalto.org/files/assets/public/v/3/development-services/building-permits/pa_residential-photovoltaic-systems-pa_07302024.pdf
- Custom Placards Required
- 1
- Non Standard Planset Requirements
- BOS Elevation
Ground mount
- Ground Mount Fencing Required
- Situational
- Ground Mount Notes
scrim mesh for gm case by case basis on fencing around GM's