City of Paramount (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
2
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
None
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Load Side Taps,PV Breaker,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc


Provide an elevation view of the battery on the exterior wall. Show its minimum set-back from the nearest door or window. 

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

 Provide an elevation view of the battery on the exterior wall. Show its minimum set-back from the nearest door or window. 

Cover Page

 Specify the owner’s name on the cover sheet.

Cover Page Notes

All Jobs [All PV equipment shall be listed by a recognized testing lab. // Utility will be notified before activation of PV system.]

Roof Plan

Show the conduit run on the roof plan


 Provide roof access, pathways and spacing to comply with CRC R324.6.

Roof Plan Notes

All Jobs ["Conduit to be minimum 7/8" above roof surface"]

Electrical Diagram

Standard

Electrical Diagram Notes

All Jobs [When a backfed breaker is the method of utility interconnection, breaker shall not read Line and Load, 2025 CEC 690.10(E) // ALL PV EQUIPMENT SHALL BE LISTED AND TESTED BY A NATIONALLY RECOGNIZED TESTING LABRATORY]


The sum of the ampere ratings of all overcurrent devices on panel boards, both load and supply devices, excluding the rating of the overcurrent device protecting the busbar, shall not exceed the ampacity of the busbar. The rating of the overcurrent device protecting the busbar shall not exceed the rating of the busbar. Permanent warning labels shall be applied to distribution equipment displaying the following or equivalent wording: [CEC 705.12(B)(3)(3)] Provide this sign.

Label Page

Provide warning label at the utility interactive inverter or ground fault indicator stating "WARNING: ELECTRICAL SHOCK HAZARD. IF A GROUND FAULT IS INDICATED, NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED"

Custom Placards Required
1

Ground mount

Ground Mount Fencing Required
Mesh/Scrim