California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTesting
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Testing
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Storage Systems,Existing Systems,Trenching,MPU,Derate
How Many Plansets Required
2
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes
  • 2018 FIRE SETBACKS
  • Provide the size of roof overhang. Provide a 3' plus the roof overhang size of pathway measured from the edge of the roof overhang (flying rafter). Or 3' pathway from the load bearing walls. Example If the roof overhang is 2', provide 5' pathway.
  • Ensure and show that fire access pathway is a minimum of 3' at all points along the roof. Example show 3' pathway along ridge even if we are not installing on adjacent mounting plane.
  • Ensure that the pathway does not cross over any roof obstructions.
  • INCLUDE NOTE - 8" clearance from the module's edge to the roofing edge.

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes
  • Structural calcs shall show all formulas used for addressing the vertical and lateral stability of the modules supports, including the wind uplift forces and the quantities of parameters used with references to corresponding codes sections.
  • The structural calculations shall comply with NDS Sec. 12.2.1.1
  • The length of the tapered tip of the bolts/screws have SHALL NOT IGNORE the required lag's embedment into the framing members.
Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
All Jobs
Allowed POI
Meter Adapter,Load Side Taps,PV Breaker,Line Side Taps
Panel Schedule Required
Partial Home Backup
Service Ground Requirements


If the existing system is not in compliance, we must provide instruction to address method to fix the existing grounding system if it is not in compliance with the current CEC requirements.

Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc

ESS Elevation with attachment method for battery to be stamped as well

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

For MPUs - Provide spec sheet of MPU type and Bus rating


List the license class of the contractor below the license #. "Class: B, C-10, C-46"

Site


Roof Plan Notes

All Jobs [8" clearance from the module's edge to the roofing edge.]

Specify roof over hang size

Specify if home is protected by fire sprinklers

Provide existing system in total roof coverage calculations

Attachment Detail

DELETE THE ATTACHMENT DETAIL ILLUSTRATION

Show that mounting system will be UL 2703 compliant. Add Certificate-of-Compliance to cut sheets.

48" max attachment span

Attachment Detail Notes

All Jobs [THE INSTALLATION OF THE PV MODULES SHALL BE PER MANUFACTURER'S INSTRUCTION // WOOD SCREWS OR LAGS SHALL BE STAINLESS STEEL // MAXIMUM SPACING OF 18" BETWEEN THE ROOF AND PV MODULES]

Electrical Diagram

INCLUDE LEADER POINTING TO GROUNDING ELECTRODE INDICATING -(N) 5/8 copper, L=8' electrode to be installed min 6' away from existing ground. Connect the existing and new grounds with #6 conductor together

Electrical Diagram Notes

All Jobs [GROUNDING SYSTEM SHALL BE IN COMPLIANCE WITH 2025 CEC REQUIREMENTS]

Label Page

Provide address on placard.

Label Page Notes

All Jobs [SIGNAGE WILL BE UL 969 COMPLIANT]

Custom Placards Required
1
Non Standard Planset Requirements
BOS Elevation
Non Standard Revision Requirements

PROVIDE A DETAILED NARRATIVE LETTER, DO NOT USE ABBREVIATIONS LIKE 'BOS', ETC.

Ground mount

Ground Mount Fencing Required
Mesh/Scrim