Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Poway (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
2
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes - 10kW+
Wet Stamps Required
None
Structural Calculations Required
Yes - 10kW+
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category C

Snow Load
5
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,Load Side Taps,Meter Adapter,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

Mark MPU as (E) existing on plans

Add “CAUTION: MULTIPLE SOURCES OF POWER.” note on site placard

Cover Page

If performing an MPU, the scope of work on the cover page needs to include this.

Site

BOS equipment cannot be placed on the front of the home facing the street.

Attachment Detail

Module Compatibility List or a documentation/certification to verify that the rack system has been evaluated and tested for grounding and bonding with the new solar module

Specification sheets showing the fire class rating/classification. Verify compatibility with the PV solar module.

UL 2703 Listing.

Electrical Diagram

Three line diagram only.


Breaker tie-in: note that the PV breaker will be placed at the opposite end of the busbar from the main breaker

Electrical Diagram Notes

All Jobs [New electrical shall be located at least three (3) feet from gas meter or gas shut off valves. CPC1208.7.1; CEC 110.26. // Grounding electrode conductor shall be sized per CEC 250.66]


All Jobs [The AIC rating for the main breaker and solar breaker shall have an equal or greater AIC ratings than the existing breakers CEC 690.13(E). or by other means of showing the PV system is rated for the available fault current.]


All Jobs [The minimum distance between the conduits located on the roof and the roof surface are greater than 1"]

Label Page

Each ESS disconnecting means shall plainly indicate whether it is in the open (off) or closed (on) position and be permanently marked "ENERGY STORAGE SYSTEM DISCONNECT."

The disconnecting means shall be legibly marked in the field to indicate the Nominal ESS AV voltage and maximum ESS DC voltage [CEC 706.15(C)(1)]

Label Page Notes

All Jobs [Marking should be placed on all interior and exterior DC conduit, raceways, enclosures and cable assemblies, every 10 feet, at turns and above/or below penetrations and all DC combiner and junction boxes. // 2025 CEC 690.31(D)(2)]

Custom Placards Required
1
Placards Notes

See (7) Inspection Guide_201706291256135953.docx Page 7-8

Non Standard Planset Requirements
Single Line Diagram

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes

Per City, GM's do not require fencing UNLESS the yard is not fenced. However, the setbacks are different for each property because it is a wildlife habitat and there are some "NO BUILD ZONES" Include full parcel/property on site plan

Setback Front Yard
10
Setback Back Yard
10
Setback Side Yard
10
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Poway (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.