City of Rialto (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes - 10kW+
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Ee Stamp Notes
EE stamp required when the system is over 10KW
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
All Jobs [PV arrays shall be located at least 2h2 (2 times the maximum height of the modules above the roof deck) from the roof edge, a gable ridge or a hip ridge.]
EX: If the modules are 6in above the roof surface, the minimum setback would be 2 x 6in = 12 inches.
Structural & loads
- Wind Speed
- 130
- Wind Notes
Exposure Category C, Seismic zone D
- Snow Load
- 0
- Snow Load Notes
N/A
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
SE digital stamps on corresponding PV pages, PE Letter & Calcs.
WS:130mph. Exposure C.
Structural engineering documents must indicate the number of panels
City of Rialto wants the wind speed on the cover sheet to match structural calculations.
Provide the engineer's stamp and signature on plan sheets for structural components. Provide on roof or site plan.
Structural calcs need to be unlocked for AHJ to add approval stamp.
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Conditional Criteria
- BATTERY PROJECTS: Where the disconnect is NOT located within sight of the ESS, the disconnect shall be capable of being locked in the open position.
- Electrical Load Calcs Required
- Derates,MPUs
- Allowed POI
- Meter Adapter,Load Side Taps,PV Breaker,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Service Ground Requirements
EGC WIRE WILL NOT BE SPLICED EGC WILL BE RAN CONTINUOUSLY METALLIC PIPING IN THE BUILDING TO BE BONDED PER CEC 250.104
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Illumination must be provided at ESS and cannot be controlled ONLY by automatic means.
- Light from adjacent sources is permitted to satisfy the requirement.
- ESS shall be located not less than 3 feet from doors or windows directly entering the dwelling unit.
- Provide ESS attachment details
ESS DISCONNECT TO BE LOCATED NEXT TO THE BATTERY
add Solaredge backup interface spec sheets for energy bank (this is not a standard spec sheet that gets generated with planset - make sure to add)
make note of chint breaker size as the AHJ does not think 63 amp is the correct breaker
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
- Panel Labels: If existing Main Service Panel does not have a panel label, we will not pass inspection. Inspector wants Bus Certification to confirm Panel Manufacturer. Request this through a stamp task to our Stamping Vendor.
- Make sure date is on the plans. GTE does not have the date on their plans. Provide spec sheets for all equipment to be installed, such as modules, junction boxes, disconnect boxes, inverters, and solar panel anchorage system Include the existing panels to the array area
- Because of our proximity to the San Andreas fault, all underground pipe, conduit, and lines will be shaded with cleaned dirt void of any rocks or clean sand, six inches below and twelve inches above said pipe, conduit, or line.
- And all electrical metal conduit will need a ground conductor; the metal conduit will not act as the ground conductor.
- Cover Page
Identify on the cover sheet, the occupancy type, construction type, sprinklered or not and how many stories is the existing home.
Include the name and address of the owner and designer, site address, and list all consultants (engineer, energy, soils, etc.), associated with the project
- Cover Page Notes
All Jobs [130 MPH WIND SPEED, EXPOSURE C, SEISMIC ZONE D]
- Site
ALL JOBS:
- Identify center line of street with street name, property lines, all parking spaces including accessible parking spaces and accessible van parking spaces
- Identify the accessible path of travel from street sidewalk to building entrance on site plan Identify the area under the permit on the site plan
BATTERY JOBS:
- Specify with a note "ESS shall be located not less than 3 feet from doors or windows directly entering the dwelling unit."
- Roof Plan
Spans should be 4ft due to high wind speed PV arrays shall be located at least 2h2 (2 times the maximum height of the modules above roof deck) from the roof edge, a gable ridge or a hip ridge.
- Attachment Detail
Specify 5/16" diameter lag screw, 4" length with 2-1/2" embedment.
- Electrical Diagram
120% rule allowed per CEC 705.12(B)(2)(3)(d)
EGC WIRE WILL NOT BE SPLICED
EGC WILL BE RAN CONTINUOUSLY METALLIC PIPING IN THE BUILDING TO BE BONDED PER CEC 250.104
Required: #6awg ground from modules to MSP
Required: Label the string callout with the roof where the modules in that string are located.
City of Rialto does not require production meter
BATTERY PROJECTS:
Where the disconnect is NOT located within sight of the ESS, the disconnect shall be capable of being locked in the open position.
- Electrical Diagram Notes
MPU [There shall be two ground rods separated by six feet or more, or provide a certified test showing that the residence to the ground is 25 ohms or less w/ (1) 6, Bare Copper.
Ground rod to be used is 5/8" x 8' copper-bonded ground rod per CEC 250.52]
Battery Jobs - Backfeed breaker must indicate that the ESS will backfeed on same breaker
Battery [The PV disconnecting means shall be installed at a readily accessible location either on the outside of a building or structure or inside nearest the point of entrance of the system conductors. A single, visible-open, lockable AC disconnect shall be within 3 feet of the meter on the exterior of the building. Note on single line diagram.]
- Label Page
Battery
ESS Notification and Marking Each ESS disconnecting means shall plainly indicate whether it is in the open (off) or closed (on) position and be permanently marked "ENERGY STORAGE SYSTEM DISCONNECT."
The disconnecting means shall be legibly marked in the field to indicate the following:
Nominal ESS AC voltage and Maximum ESS DC voltage
- Custom Placards Required
- 1
- Placards Notes
- Permanent Main Site Placard posted at MSP
- Permanent disconnect placards from Placard page of plan set
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
GM's do not require fencing, however they have setback requirement of 5' on side and 10' in from rear.
- Setback Back Yard
- 5
- Setback Side Yard
- 10