City of Richmond (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
44568
Any SolarAPP+ Restrictions
1
SolarAPP+ Restriction Notes
No PV + Storage for SolarAPP+ Geocortex Viewer for HTML5 (richmond.ca.us) (http://geoweb02.ci.richmond.ca.us/Html5Viewer/Index.html?configBase=http://geoweb02.ci.richmond.ca.us/Geocortex/Essentials/REST/sites/GISViewerINTERNET/viewers/html5/virtualdirectory/Resources/Config/Default)
SolarAPP+ Restrictions
Existing Systems,Trenching,MPU,Derate
How Many Plansets Required
3
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Snow Load Notes

N/A

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

No published information about battery placement. If battery system, include this note on ELD: Producer's storage device(s) will not cause the Host Load to exceed its normal peak demand. Normal peak demand is defined as the highest amount of power required from the Distribution System by Producer's complete facilities without the influence or use of the energy storage device(s).

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

AHJ stated No load side taps, PV back feed shall be install in MSP

Site

label new pv and ess as existing

Attachment Detail

The maximum height of the array is 6โ€

Electrical Diagram

120% rule allowed per CEC 705.12(B)(2)(3)(d)

label new pv and ess as existing

Electrical Diagram Notes


Custom Placards Required
1

Ground mount

Ground Mount Fencing Required
No