City of Riverside (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Storage Systems,Existing Systems,Trenching,MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- Yes - 10kW+
- Wet Stamps Required
- Digital Electrical,Digital Structural
- Structural Calculations Required
- Yes
- Ee Stamp Notes
Over 10k requires EE stamps
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Snow Load Notes
N/A
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- AC Disconnect Conditional Criteria
- All Jobs [AC DISCONNECT WILL BE PROVIDED WITHIN 10" TO 72" FROM THE EXISTING SERVICE METER AND WILL BE INSTALLED BETWEEN 48" TO 75" ABOVE THE FLOOR OR GRADE LEVEL. // EXTERNALLY OPERATED KNIFE BLADE TYPE AC DISCONNECT SWITCH WHICH IS LOCKABLE IN THE OPEN POSITION, VISIBLE DESIGNATIONS WHICH IS ACCESSIBLE TO RIVERSIDE UTILITIES DEPARTMENT EMPLOYEES AT ALL TIMES AND NON-FUSED NEC 690.17 AND (NEMA 3R). // METER HEIGHT AT CENTER OF METER SHALL BE 48" - 75". MAINTAIN 3FT PERIMETER LEVEL AND CLEAR SPACE IN FRONT OF METER.]
- Electrical Load Calcs Required
- Derates,Load Relocation
- Allowed POI
- Line Side Taps,Load Side Taps,Meter Adapter,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 75
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
ESS disconnect required within line of sight of battery on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
- CSI CALCS ARE REQUIRED FOR EACH ARRAY ---> CSI CALCULATOR
- Cover Page
- Include wind speed and snow load
- Include meter number
- Cover Page Notes
All Jobs [A provision in the 2025 California Residential Code (CRC) requires that Smoke alarms and Carbon Monoxide alarms be retrofitted into the existing dwelling. These Smoke alarms are required to be in all bedrooms, outside each bedroom, and at least one on each floor of the house. Carbon Monoxide alarms are required to be retrofitted outside each bedroom and at least one on each floor of the house. These alarms may be solely battery operated if the Photovoltaic project does not involve the removal of interior wall and ceiling finishes inside the home, otherwise, the alarms must be hard wired and interconnected.]
- Site
- Identify all structures on the site (ADU, Shed, Pool)
- Thoroughly review the site from the aerial imagery in Aurora. Anything that could be misconstrued as a structure needs to be called out on the site plan (Umbrellas, RVs, concrete pads, etc)
- Include the rating of the service panel and main breaker in the leader on the site plan
- Roof Plan
- THE LAYOUT OF EXISTING PV SYSTEMS NEED TO BE ILLUSTRATED AS INDIVIDUAL MODULES, NOT ONE BIG 'OBSTRUCTION'
- Layout of modules needs to be replicated in Aurora before downloading DXF
- IF THE EXISTING SYSTEM IS NOT RAPID SHUTDOWN COMPLIANT, THEN A DOTTED LINE SHALL BE DRAWN AROUND THE ARRAY, WITH A LEADER INDICATING THAT THE ARRAY WILL REMAIN ENERGIZED
- Show rafters and attachment points on roof plan
- Attachment Detail
- Please identify the minimum lag diameter of 5/16 inches.
- Electrical Diagram
- If combining solar output, ensure panel is called out as COMBINER PANEL and not load center
- Verify UFER or add Ground Rods (min. 2) spaced a min. 6 feet apart
- Electrical Diagram Notes
All Jobs [AC DISCONNECT WILL BE PROVIDED WITHIN 10" TO 72" FROM THE EXISTING SERVICE METER AND WILL BE INSTALLED BETWEEN 48" TO 75" ABOVE THE FLOOR OR GRADE LEVEL. // EXTERNALLY OPERATED KNIFE BLADE TYPE AC DISCONNECT SWITCH WHICH IS LOCKABLE IN THE OPEN POSITION, VISIBLE DESIGNATIONS WHICH IS ACCESSIBLE TO RIVERSIDE UTILITIES DEPARTMENT EMPLOYEES AT ALL TIMES AND NON-FUSED NEC 690.17 AND (NEMA 3R). // METER HEIGHT AT CENTER OF METER SHALL BE 48" - 75". MAINTAIN 3FT PERIMETER LEVEL AND CLEAR SPACE IN FRONT OF METER. // PERMANENT PLACARD REQUIRED DENOTING THE LOCATION OF ALL ELECTRIC POWER SOURCE DISCONNECTING MEANS.]
- Label Page
- The site placard must be oriented, so the BOS is parallel with the bottom of the page
- The compass arrow must be rotated to always point North
- Include note on placard - CAUTION: MULTIPLE SOURCES OF POWER.
- SHOW EXISTING ARRAYS ON PLACARD
- IF EXISTING ARRAYS ARE NOT COMPLIANT WITH THE CURRENT CEC RSD REQUIREMENTS, A DOTTED LINE SHALL BE PLACED AROUND NON-COMPLIANT ARRAYS AND INCLUDE A LEADER INDICATING 'NON-RSD COMPLIANT ARRAY'
- Label Page Notes
Existing Systems [NON-COMPLIANT ARRAYS WILL REMAIN ENERGIZED]
- Custom Placards Required
- 1
- Placards Notes
Specific Placards Required (see file PV Sign Requirements-Form PV.5),
- Non Standard Revision Requirements
- FOR MOD SWAPS, LAYOUT CHANGES, OR ANY CHANGE INVOLVING THE LOCATION OF MODULES NEW CSI CALCULATIONS MUST BE PROVIDED
- Red clouds and deltas required for all changes post initial permit submission
Ground mount
- Ground Mount Fencing Required
- Yes