City of Rocklin (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45467
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching,MPU
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Electrical,Digital Structural
- Structural Calculations Required
- Yes
- Ee Stamp Notes
- CA-licensed electrical engineer
- Complete stamping of all ESS-related electrical documents
- Stamp Location On Plans
- Top Right
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates,Load Relocation
- Allowed POI
- Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 75
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 1
- ESS Notes
ESS REQUIRE EE AND PE STAMPS
- Complete both the load calcs work sheet (the AHJ specific one uploaded below) and the ESS submittal checklist uploaded in the files below
- Put "ESS Disconnect" on the A/C Disconnect on the ELD as well as the Placard
- Provide an elevation showing the location of the battery and all other electrical equipment with full dimensions between all equipment and doors/windows
- Note on elevation plan - โA minimum of three feet clearance is required between ESS units and any door or window entering into the dwelling unit.โ
- Note on the elevation plan - โA minimum of three feet clearance is required between ESS units/electrical equipment and vegetation.โ
- Include ESS Mounting Details
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
Fill out City Of Rocklin checklist ahead of permitting
- Load calcs: use AHJ template from the files below when load calcs are required
- Each page of the plans needs to have either the designer's or Greg's signature on it. Fill out solar checklist for roof mount
- Cover Page
Detailed Scope of Work(SOW) - LACO works fine.
- (A) Number of story
- (B) Occupancy Type
- (C) Energy Storage System (ESS)
- Total number of ESS Units
- Number and Model
- Location
- -state under the scope of work where the battery will be mounted
- Roof Plan
Array coverage calculations must include existing systems.
- Attachment Detail
Indicate style, length and diameter of embedment bolts
- Electrical Diagram
Centerfed 120%: Sometimes
- Custom Placards Required
- 1
- Non Standard Revision Requirements
Respond to each comment in writing, clearly describing what revisions were made and the location of your revisions (page, plan and detail number). All revisions shall be bubbled and indicated with a delta revision number
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim