Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,Load Side Taps,Meter Adapter,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
[LACOF]
This AHJ follows County of Los Angeles (ESS Requirements) (CA).
- Please follow this link to County of Los Angeles (ESS Requirements) (CA)
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
NOTE - LA County Fire Prevention - Irwindale Office DOES NOT allow wall vents to be covered/relocated in order to meet 3' ESS clearances - DO NOT INSTALL ESS WITHIN 3' OF DOORS (INCLUDING GARAGE), WINDOWS (REGARDLESS IF THEY OPEN OR NOT), WALL VENTS/OPENINGS, OR WITHIN 5' OF PROPERTY LINE & 10' OF ANY VEGETATION - Fire Inspection will reject photos/Fail Fire Inspection & require relocation
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Electrical Diagram
If project has a battery: Include Power Source Disconnect Schedule
- Electrical Diagram Notes
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim