City of Salinas (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 46057
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 3
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Provide a dimension on the site plan from the roof edge to the panel edge. The distance must be a minimum of 2h2 (two times the height that the panels sit above the roof)
Structural & loads
- Wind Speed
- 95
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Snow Load Notes
N/A
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- ESS Structural Wall Calcs Required As Well
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,Load Side Taps,PV Breaker,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
If battery system, include this note on ELD: Producer's storage device(s) will not cause the Host Load to exceed its normal peak demand. Normal peak demand is defined as the highest amount of power required from the Distribution System by Producer's complete facilities without the influence or use of the energy storage device(s). If battery is installed in garage, Provide partial floor plan. Show adequate working clearances and protection from vehicle impact if necessary. Note or show that there are no openings into the dwelling within 3 ft of the ESS
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Ground Mount: Fencing may be required, depends on where the ground mount will go on property,
Provide spec sheet for MPU being installed
- Cover Page
- Cover Page Notes
All Jobs [ Occupancy: (R-3) // Construction Type: (V-B) // Number of Stories: 1 // Sprinklered: NO)
- Roof Plan Notes
ALL JOBS [Mean roof height is 15 ft]
- Electrical Diagram
120% rule allowed per CEC 705.12(B)(2)(3)(d)
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- Situational