City of San Bernardino (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
2
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes - 10kW+,Yes - Battery
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Rooftop AC Units: 30" CLEARANCE REQUIRED AROUND

Structural & loads

Wind Speed
130
Wind Notes

Exposure Category C

Snow Load
5
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Battery projects will require SE calcs from the engineer stating that the equipment being mounted to can support the weight of the batteries.

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Load Side Taps,Line Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96
BOS Restrictions

A disconnecting means is required within sight of the MSP

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
  • ESS Units shall be located 3ft from any doors or windows.
  • ESS Equipment's disconnecting means shall be readily accessible. The disconnecting means shall be located within sight of the ESS
  • Battery disconnect needs to be within 10" of battery not MSP
  • When drawing Solaredge Backup Interface, remove the RSD block on the ELD (or you will need to draw this on the site plan and site placard as well)

WHEN ESS IS LOCATED IN GARAGE

  • Listed Heat Detector is required to be included in the plan set, corresponding data sheet required
  • Elevation drawing showing battery is 3' above floor to avoid the installation of an impact protector is required if battery in inside garage
  • verify chint breaker size is correct (63a) for SE7600 and 10000 energy bank inverters
Separate ESS Disconnect Required
Local Disconnect,ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

H-Frame

Include elevation detail showing H-Frame details, proposed equipment locations, depth / footing detail

Site


Site Notes

Battery [ESS EQUIPMENT SHALL BE LOCATED 3' FROM ALL DOORS AND WINDOWS DIRECTLY ENTERING THE DWELLING UNIT. CRC R328.4 MULTIPLE ESS SYSTEMS SHALL BE SEPARATED FROM EACH OTHER BY AT LEAST 3'.]

Roof Plan Notes

All Jobs [PV arrays shall be located at least (2 times the maximum height of the modules above roof deck) from the roof edge, a gable ridge or a hip ridge]

Electrical Diagram

SUB PANEL

  • Specify the distance between the existing main panel and the new subpanel (using a dimension line on the ELD).
  • If this distance is greater than 6' Provide note on TLD: [EXISTING LOADS BEING RELOCATED TO SUB-PANEL LOCATED GREATER THAN 6 FEET AWAY, ALL LOADS WILL THEREFORE BE AFCI PROTECTED]
Electrical Diagram Notes

Existing Systems [ALL PV SOURCES SHALL BE COMBINED INTO A SINGLE DEDICATED OVERCURRENT PROTECTION DEVICE]

All Jobs [AC disconnect required within 10' of Inverter]

Label Page

DERATE

MUST INCLUDE LABEL INDICATING THAT BREAKER HAS BEEN DOWNSIZED AND SHALL NOT BE UPSIZED. ON THE LABEL, INDICATE THE AMPS THAT THE BREAKER HAS BEEN DERATED TO

Custom Placards Required
0
Non Standard Revision Requirements

DO NOT use abbreviations such as 'BOS' etc. on the narrative letter

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes

Attached is the standards for cell sites. Being ground mounted there will also be requirements from fire and also building and safety. The project would require a Conditional Use Permit if it is a new system. Attached is the Planning Entitlement application. The items you would need for the entitlement are listed on the last page highlighted. 10' from other structures per Elizabeth - AHJ plan checker Scrim fencing is allowed instead of full fencing

Setback Back Yard
3
Setback Side Yard
3
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of San Bernardino (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.