City of San Mateo (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 3
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- If battery system, include this note on ELD: Producer's storage device(s) will not cause the Host Load to exceed its normal peak demand.
- Normal peak demand is defined as the highest amount of power required from the Distribution System by Producer's complete facilities without the influence or use of the energy storage device(s).
- Provide anchorage details for the TESLA POWERWALL. Show the operating weight for the energy storage system
- Provide locations of the windows/doors along the wall where ESS storage is to be located
- Provide elevation view showing ESS is at least 3 ft away from any openings (windows or doors) into the dwelling per CRC 328.4.
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes
Plan set
- Cover Page
Add a description of work to the cover sheet stating the system size, number of modules, and additional electrical equipment to be installed. Example: "14 (400w) roof mount solar modules PV rating at 5.6kw + (N) 100a subpanel"
- Roof Plan
**BALLASTED SYSTEMS:** * signage or roof markings (e.g., yellow stripes) shall be provided delineating the area around the panel that must be kept free of obstructions. Please specify on the plans. * Electrical connections to ballasted arrays must be installed with flexibility to allow for seismic movement; provide a detail showing this connection. * Please check roof framing members for the additional dead load from ballast blocks and components per manufacturer’s specifications. Provide roof framing plan and check the most conservative loaded roof joists.
- Electrical Diagram
Standard
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim