City of South Gate (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Testing
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
3' wide clear perimeter around the edges of the roof. Shall be capable of supporting the firefighters accessing the roof. Access pathways shall be over load bearing wall or inward, not over eaves. Modules shall be located no closer than 6" minimum to a hip or valley if modules are placed on both sides Where modules are located on only one side of a hip or valley that is of equal length, the modules may be placed directly adjacent to the hip or valley Modules shall be located on only one side of any ridge and shall be located not higher than 1" below the ridge
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,PV Breaker,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
[LACOF]
This AHJ follows County of Los Angeles (ESS Requirements) (CA).
Please follow this link to County of Los Angeles (ESS Requirements) (CA)
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
- Cover Page
Specify type of contractor's license being used
Provide a sheet index on the title sheet.
Specify the building type of construction, VB, and occupancy Group, R3, on the title sheet.
- Cover Page Notes
All Jobs [Required clearance of any existing plumbing and mechanical vents will be maintained per code.]
- Site Notes
ADD NOTE: Do not cover mechanical and plumbing vents at roof with solar PV panels. Maintain required clearance of any existing plumbing and mechanical vents per code
Show size of J-box per CEC (8x conduit size, etc.)
- Roof Plan
Specify roof fire classification, roofing material, number of layers, slope on roof plan.
Show the roof available access point on the roof plan.
Specify on the plans weight of solar panels.
- Roof Plan Notes
ADD NOTE: Do not cover mechanical and plumbing vents at roof with solar PV panels. Maintain required clearance of any existing plumbing and mechanical vents per code.]
- Electrical Diagram
Standard
Show size of J-box per CEC (8x conduit size, etc.)
- Label Page
Add a label stating "Do not step on solar modules".
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim