City of Temecula (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45187
Any SolarAPP+ Restrictions
1
How Many Plansets Required
3
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Include any existing modules in the array roof coverage calcs to determine if modified setbacks can be used.

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category C

Snow Load
0
Reducible Snow Load Allowed
0
Max Attachment Spacing
96
Structural Notes

Temecula does require Structural Calcs

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
  • ESS is not allowed in the garage or interior spaces. No exceptions.
  • Demonstrate compliance that ESS is minimum 3' from other ESS and from doors/windows.
  • Tesla Powerwall 2 will require a Rapid Shutdown Device. RSD (This should be indicated on SLD

If ESS is not in line of sight of MSP then ESS disconnect required within line of sight of ESS on same wall and not blocked by walls/gates/etc


1/31/24 ISOLATED LOADS PANEL WIRE SHOULD BE SIZED ACCORDING TO TESLA GATEWAY BREAKER SIZE. EXAMPLE: IF TESLA GATEWAY IS FED BY A 125A BREAKER, THEN THE WIRING FOR THE ISO PANEL SHOULD BE 1/0 EVEN IF WE HAVE A 100A BREAKER ACCORDING TO THIS AHJ


2/21/24 BACKUP LOADS PANEL WIRE SHOULD BE SIZED ACCORDING TO TESLA GATEWAY BREAKER SIZE. EXAMPLE: IF TESLA GATEWAY IS FED BY A 125A BREAKER, THEN THE WIRING FOR THE ISO PANEL SHOULD BE 1/0 EVEN IF WE HAVE A 100A BREAKER ACCORDING TO THIS AHJ

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

ALL JOBS

  • Plans must show residential egress or state "NO RESIDENTIAL EGRESS"
  • Call out 1st & 2nd story roofs
  • Include spec sheets for all new equipment being installed including load centers and main/sub panels
  • Provide certificate of compliance to confirm (ESS, Panels, Inverters, Racks, Etc.) is Listed for use by a NRTL (Nationally recognized testing laboratory
  • Provide the Module Compatibility List to verify that the rack system has been evaluated and tested for grounding and bonding (UL2703) with the specified new solar module.

EXISTING SYSTEMS

  • The site placard must show both the existing and new modules
  • Show the type of Rapid Shutdown on the existing system (array boundary vs. module level shutdown) per CEC 690.12(B) and/or CFC 1205.4.2 and provide appropriate labeling and identification on Building Directory

EV CHARGER

  • complete and submit the attached EV charger handout.
  • Provide a floor plan that shows the location of the EV charger and remove all PV system details. The plan needs to be EV charger specific.
  • Also, provide the product specs for the EV charger. 
Cover Page Notes

Provide a Building Code Data Legend on the Title Sheet. Include the following code information for each proposed building: a. Occupancy Classifications (e.g. R-3/U for Single Family Dwelling) b. Type of Construction (e.g. Type V-B for wood framed construction) c. Fire Sprinklers (Yes or No) d. Number of Stories

Site Notes

Roof Mount [Emergency escape and rescue opening. Panels and modules installed on dwellings shall not be placed on the portion of a roof that is below an emergency escape and rescue opening. A 36-inch-wide pathway shall be provided to the emergency escape and rescue opening. CRC R324.6.2.2]

Attachment Detail Notes


Electrical Diagram
  • Any existing conductors shown on the ELD must have their size called out.
  • If Main breaker is to be used as the Rapid Shutdown Initiator, please indicate so on the ELD
  • For SEEB Projects: Utilize 100A AC Disconnect for 63A CHINT breaker.
Electrical Diagram Notes

Add the following notes: i. New circuit breakers shall match the manufacturer, type and kAIC rating of the (E) panel. ii. All outdoor equipment shall be raintight and hold a minimum NEMA-3R rating. [CEC 110.28, 404.4(A), 408.16] iii. If the existing main service panel does not have verifiable grounding electrode, it is the PV contractor's responsibility to install a supplemental grounding electrode.

Label Page

Add the following notes: i. New circuit breakers shall match the manufacturer, type and kAIC rating of the (E) panel. ii. All outdoor equipment shall be raintight and hold a minimum NEMA-3R rating. [CEC 110.28, 404.4(A), 408.16] iii. If the existing main service panel does not have verifiable grounding electrode, it is the PV contractor's responsibility to install a supplemental grounding electrode.


Each ESS disconnecting means shall plainly indicate whether it is in the open (off) or closed (on) position and be permanently marked "ENERGY STORAGE SYSTEM DISCONNECT.”


The ESS disconnecting means shall be legibly marked in the field to indicate both the Nominal ESS AC voltage and Maximum ESS DC voltage [CEC 706.15(C)(1)]


“PHOTOVOLTAIC POWER SOURCE” or “SOLAR PV DC CIRCUIT” marking should be placed on all interior and exterior DC conduit, raceways, enclosures, and cable assemblies, every 10 feet, at turns and above/or below penetrations and all DC combiner and junction boxes. [CEC 690.31(D)(2)]


Non Standard Planset Requirements
N/A
Non Standard Revision Requirements
  • You will need to submit a full set plans, calcs and revision narrative.

Ground mount

Ground Mount Fencing Required
Situational
Ground Mount Notes

10' ground mount setbacks case by case fencing on ground mounts

Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Temecula (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.