City of Turlock (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Testing
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 3
- Revision Required
- 1
- Rough Inspection
- Fire Inspection
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Need to submit solar checklist. AHJ requires attic runs, no EMT on rooftop. AHJ Corrections: show conduit run. NO conduit is allowed in the required fire setback and access pathways - JH Add note to plans Junction box not to be installed within fire clearances
- Roof Plan
* Show electrical conduit run on plans * Clarify external or internal conduit/wiring. * If conduit/wiring to be ran in the attic. it MUST maintain a minimum 18 below roofing members * Conduit may not cross a ridge line
- Roof Plan Notes
All Jobs [Junction box not to be installed within fire clearances] All Jobs [ Conduit MAY NOT cross a ridge line.]
- Attachment Detail
Footing Inspection, which can be done at final, is ONLY required for Ground Mounts
- Electrical Diagram
For MPU's, remove note on single line MPU Permit to be Pulled Separately
- Electrical Diagram Notes
All Jobs [MAIN A/C DISCONNECTING MEANS AND SOLAR A/C DISCONNECT MUST MAINTAIN MAXIMUM 10 FT. SEPERATION BETWEEN EACH OTHER AND WITHOUT OBSTRUCTION.]
- Custom Placards Required
- 1
- Non Standard Planset Requirements
- Single Line Diagram
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim