Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Twentynine Palms (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45573
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
3
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes - 10kW+,Yes - Existing PV
Wet Stamps Required
None
Structural Calculations Required
Yes
Ee Stamp Notes

EE required if system is over 10kW (include existing system, if applicable)

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
85
Wind Notes

Exposure Category C

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,Load Side Taps,Meter Adapter,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.87

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Battery jobs require special placards.

Battery and lockable Disco go inside garage.

Provide an elevation view of the proposed location of the batteries. The elevation must include dimensions of the batteries from each other, other components and to all exterior wall openings including, windows and doors.

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc

Lockable disconnect required after battery (backup).

Separate ESS Disconnect Required
Local Disconnect,ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

Add spec sheet for MPU

Electrical Diagram

120% rule allowed per CEC 705.12(B)(2)(3)(d)

Custom Placards Required
1
Placards Notes

Permanent placards from approved plans

Ground mount

Ground Mount Fencing Required
Yes
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Twentynine Palms (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.