City of West Covina (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45212
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
2
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
None
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

AC Disconnect Conditional Criteria
Power Source Disconnect schedule required - include on site plan, roof plan, and ELD pages Disconnect number Type of Disconnect 1 of 3 Utility disconnect (main service disconnect, must shut off all utilities to the residence) 2 of 3 PV rapid shutdown disconnect (RSD device can be found on the SolarEdge inverter. For microinverters the breaker in the combiner box acts as this disconnect) 3 of 3 Energy Storage System disconnect (Any AC disconnect that disconnects the battery) See "Approved plans" saved to files for example of disconnect schedule on site plan and ELD.
Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

[LACOF]

This AHJ follows County of Los Angeles (ESS Requirements) (CA).

Please follow this link to County of Los Angeles (ESS Requirements) (CA)

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc

Separate ESS Disconnect Required
Local Disconnect,ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Electrical Diagram

Standard

Custom Placards Required
1
Non Standard Planset Requirements
BOS Elevation

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes

AHJ does not allow GMs in front as they are considered "patio covers"

Setback Back Yard
5
Setback Side Yard
5
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of West Covina (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.