County of Alameda (CA)
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTesting
Fire Setback Enforced1
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Testing
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- Other (See Submission Notes)
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Structural Calculations Required
- No
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Snow Load Notes
N/A
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- AHJ unclear, Assumed PE stamps not required Provide an elevation drawing view to show the height of the building includes the proposed PV panels
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Load Side Taps,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
No published information about battery placement. If battery system, include this note on ELD: Producer's storage device(s) will not cause the Host Load to exceed its normal peak demand. Normal peak demand is defined as the highest amount of power required from the Distribution System by Producer's complete facilities without the influence or use of the energy storage device(s).
- Separate ESS Disconnect Required
- Local Disconnect,ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Cover Page
- Full Scope of Work
- Occupancy class (Typically R3)
- Construction type (Pick A type that reflects current home: Type 1: Fire-resistive: High-rise buildings made of concrete and protected steel. Type 2: Non-combustible: Newer buildings with tilt-slab or reinforced masonry walls and a metal roof. Type 3: Ordinary: New or old buildings with non-combustible walls but a wood-framed roof. Type 4: Buildings with heavy timber framing. Type 5: Buildings with wood framing.)
- Attachment Included? Yes
- Electrical Diagram
Standard
- Custom Placards Required
- 1
- Placards Notes
Permanent placards off of placard page of plan set
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Setback Front Yard
- 30