Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

County of El Dorado (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusNot accepted
Wet Stamps RequiredDigital Electrical,Digital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Not accepted
How Many Plansets Required
2
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes - Derate
Wet Stamps Required
Digital Electrical,Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
130
Wind Notes

Exposure Category C

Snow Load
999
Snow Load Notes

Any snow load greater than 20lbs will require structural calcs, and stamped plan set. The Snow load requirement is site specific with a minimum of 20 Ibs. To find the site specific snow load follow these steps: Find Parcel ID by searching the home address here: https://parcel.edcgov.us/ (https://parcel.edcgov.us/)

Enter the parcel ID on this site: [https://edcapps.edcgov.us/Planning/parceldatainfo.asp]

https://bdc.edcgov.us/

Note: do not use hyphens and do not enter the zeros at the end of the ID. (Ex. if the parcel ID is 042-511-001-000 then it will be entered as 042511001). The site specific snow load will be listed under the "Building Design Criteria for Parcel" section of the page. **

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
  • If battery system, include this note on ELD: Producer's storage device(s) will not cause the Host Load to exceed its normal peak demand. Normal peak demand is defined as the highest amount of power required from the Distribution System by Producer's complete facilities without the influence or use of the energy storage device(s).
  • When installing in a garage, a listed heat alarm is required and must be interconnected to the smoke alarm
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Site

Site/plot plans must include, at minimum, all property lines; a conventional scale; north arrow; the location, purpose, and width of all easements; any streams or wetlands; Flood Zone, and all setbacks measured from the closest property line or road easement perpendicular to the proposed development. Said revisions shall also provide topographical elevations and contour lines

Attachment Detail

INCLUDE SPAN CHARTS ON PLAN-SET AND HIGHLIGHT SPANS TO JUSTIFY OUR ATTACHMENT SPAN (ROOF MOUNT)

Electrical Diagram

Centerfed 120% allowed

Label Page

Remove any reference to NEC codes. AHJ only allows CA codes on plans.

Custom Placards Required
1
Non Standard Planset Requirements
BOS Elevation

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes

The site plan must indicate accurate property lines. If this is not provided prior to CR, the CE will need to contact the County Recorder's Office at . Do not move GM projects passed Project Review unless this is provided For ground mounts, El Dorado County has an OAK TREE CODE COMPLIANCE. We need to indicate on the plans, any oak trees within the vicinity of the ground mount. If no oak trees will be impacted, fill out: If oak trees need to be moved, refer to: ****For requesting Septic maps and plot plans**** also: For GM's, we must provide a conventional scale such as 1:10, 1:20,.... up to 1:60


1/30/24 arborist report required


list of approved contacts for septic mapping: Percolation Testers and Sewage Disposal Designers - El Dorado County

Setback Front Yard
50
Setback Back Yard
30
Setback Side Yard
30
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of El Dorado (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.