County of Kern (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- Other (See Submission Notes)
- Revision Required
- 1
- Rough Inspection
- Footing inspection
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 95
- Wind Notes
Exposure Category B
- Snow Load
- 5
- Snow Load Notes
All elevations from 5000-6000ft have a 40 PSF snow load snow load in TEHACHAPI is 30 psf
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
Please provide calculations for distributed load and point load on roof sheathing
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
RESIDENTIAL CODE 328 - PROHIBITS INSTALLATION OF TESLA POWERWALL 3 IN GARAGE
- If a battery is located inside, the project will require heat sensors for smoke & carbon detectors
- BOLLARDS REQUIRED IF NEAR VEHICLE DAMAGE
- UL 9540 APPROVED
- Separate ESS Disconnect Required
- Gateway Disconnect,ESS Disconnect
- ESS Elevation Detail Required
- Yes
Plan set
- Plan Set Requirements
- Flattened Plans set - To be able to submit online (In AutoCad, on the command line, enter EPDFSHX and change the value to 0 (zero).)
- APN needs to be on plans http://assessor.co.kern.ca.us/prop_search.php
- Fill out Expedite Checklists provided on this AHJ page (not required if project includes a battery)
- Complete expedite form - Residential Rooftop Solar Submittal Requirements and Checklist - rafters only
- Building plans shall identify the proposed bottom of solar panels and all electrical equipment to be resistant to flood damage at minimum of 1.5' above highest adjacent grade
- Cover Page
- Site
Existing Systems:
Add existing panels to Label page.
Cloud existing system
Add note: (E) Existing solar may not be rapid shutdown Compliant
- Roof Plan
AHJ Fire Setbacks have been uploaded in file section below.
A minimum clear space of three feet is provided on the control side of roof mounted HVAC equipment.
BALLAST SYSTEMS:
Show existing roof framing on the plans. Please graphically show roof framing and location of ballast blocks in relation to framing.
- Attachment Detail
Avoid using portrait orientation for Rockit attachments. If portrait orientation is required, swap to rail.
- Attachment Detail Notes
Please design at 4' spacing to avoid failing inspection
- Electrical Diagram
- Zinsco panels require load calcs, per correction for Biagioni, Dwayne
- Centerfed 120% allowed
- Label Page
Provide a site roof plaque to delineate the RS & non RS arrays, if applicable
Reflective Sticker : RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM.
- Custom Placards Required
- 1
- Placards Notes
- All Standard Placards used for CA projects
- 2nd/Additional Main Placard required to be installed at Battery for all ESS Jobs
- Derate placard stating 'DERATED MAIN BREAKER - DO NOT CHANGE' installed at derated breaker for all Derates
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
- NUANCE DQ DUE TO SOIL REPORT AND SPECIAL INSPECTIONS REPORT
- GM cannot be placed in the front. Setback requirements for the Side and Rear vary by zone and lot. Contact Planning.
- septic/record requests: Open Public RecordsNextRequest - Modern FOIA & Public Records Request Software
- GMs require 10 ft clearance around array in all cases. (Site specific property setbacks may be higher than 10ft, but 10ft is minimum clearance around array, Show on plans)
- Show the dimensions of the array (N-S and E-W direction and array height). Must match calculations.
- Flattened PV Plan Set - Needed to submit online
- This note needs to be on plans for GROUND MOUNTS - THE PROPOSED BOTTOM OF SOLAR PANELS AND ALL ELECTRICAL EQUIPMENT TO BE RESISTANT TO FLOOD DAMAGE AT MINIMUM OF 2356.0' NAVD88.
- Fencing required by AHJ
- All ground mounts will require site-specific engineering.
- Soils report should not be attached to the PV Plans. We will need to submit it separately.
- Specify on cover sheet of plans the following structural information: • Ground snow load per Section 17.06.140 of the Kern County Code of Building Regulations. • Ultimate design wind speed in miles per hour, and wind exposure. • Seismic design category (SDC) and site class.
- Specify on plans material specifications for the following: • Concrete compressive strength
- A clear, brush-free area of 10ft shall be required for ground mounted PV arrays
- Show distance from array to structures on property
- soil report and a statement of special inspections on the cover sheet, prepared by the RDP, in accordance with CBC Sec. 1704.3. for Nuance
- Please specify on cover sheet of plans, the following structural information: • Ultimate design wind speed in miles per hour, and wind exposure. • Seismic design category (SDC) and site class. Please add a note indicating the SDC = D. Site class will be determined by the soils report.