County of Los Angeles (East Los Angeles) (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 999
- Snow Load Notes
- Elevations between 2000 and 3500 ft. require 20 psf snow load
- Elevations between 3500 and 5000 ft. require 40 psf snow load
- Elevations greater than 5000 ft. require 80 psf snow load
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #8
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 75
- De Rating Ampacity
- 0.96
Battery / ESS
- ESS Notes
[LACOF]
This AHJ follows County of Los Angeles (ESS Requirements) (CA).
Please follow this link to County of Los Angeles (ESS Requirements) (CA)
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Site
ALL JOBS
- All buildings on property are to be properly labeled and called out as habitable or non-habitable.
WHEN THE PROJECT INCLUDES AN MPU, THAT WILL REMAIN IN THE EXISTING LOCATION
- Site Notes
All Jobs [ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY ACCREDITED BY THE UNITED STATES OCCUPATIONAL SAFETY HEALTH ADMINISTRATION.]
- Roof Plan
For systems with multiple strings/inverters
- The roof plan shall clearly identify how all modules are mapped to each string and/or inverter input
- Attachment Detail
Distance from top of module to roof shall be called out
- Electrical Diagram
Identify if the main panel is fed via an overhead drop or underground feed.
- If overhead, provide the size of the service entrance conductors AND ground size (GEC) Identify GEC size to Table 250.66
FOR HOT BUS PROJECTS
- Provide a panel schedule identifying all the breakers
FOR BATTERY PROJECTS
- ESS spec sheet must show compliance with UL 9540
- Show the distance between the ESS and the connected equipment. If more than 5 ft, overcurrent protection to be provided at the ESS.
FOR EV CHARGING PROJECTS
- Residential load calcs to include 125% of the EV equipment with no reductions.
- Electrical Diagram Notes
All Jobs [THE PV BREAKER SHALL BE LOCATED AT THE OPPOSITE END OF THE MAIN BREAKER OR INPUT FEEDER // LL TERMINALS TO BE RATED AT 75°C MINIMUM // ALL ELECTRICAL WORK SHALL BE DESIGNED PER 2025 LOS ANGELES COUNTY ELECTRICAL CODE, 2025 CALIFORNIA ELECTRICAL CODE, AND 2023 NATIONAL ELECTRICAL CODE. // 110.2 APPROVAL: ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY ACCREDITED BY THE UNITED STATES OCCUPATIONAL SAFETY HEALTH ADMINISTRATION.]
MPU [INCLUDE NOTE - GEC SIZE FROM MAIN SERVICE PANEL TO GROUND ROD TO BE #4 AWG. SIZE OF GEC FROM PANEL TO METAL WATER PIPE TO BE #4 AWG Add note: THE CONNECTION TO THE INTERIOR METAL WATER PIPING SHALL BE MADE WITHIN 5 FT FROM THE POINT OF ENTRANCE. PER SECTION 250.68(C)(1) // COLD WATER WITHIN 5 FEET AND AT LEAST ONE SUPPLEMENTAL ELECTRODE ARE REQUIRED // THERE SHALL BE TWO GROUND RODS SEPARATED BY SIX OR MORE FEET // GEC SIZE IS #4 AWG 1 GROUND ROD TO BE INSTALLED WITHIN 5' OF COLD WATER MAIN ENTERING THE HOME, CONNECTED VIA UL LISTED BONDING CLAMP // IF THE PROPOSED NEW MAIN PANEL IS LOCATED MORE THAN 6 FEET FROM THE EXISTING MAIN PANEL, COMBINATION-TYPE AFCI BREAKERS SHALL BE USED AS A METHOD OF PROTECTION FOR ALL 15A/1P AND 20A/1P (120V) LOADS PER 210.12(D)]
If solar ready MPU: Show model number for solar ready service panels
Battery [BACK UP LOAD CENTER WILL COMPLY WITH 210.12(A) USING AFCI BREAKERS // BOND GROUNDING SYSTEM IN BOTH BUILDINGS. NEUTRAL BUS AT SEPARATE BUILDING SHALL BE ISOLATED // THE SUB PANEL OR AC DISCONNECT SWITCH AT THE SEPARATE STRUCTURE SHALL BE SERVICE RATED 225.36 SUITABLE FOR SERVICE EQUIPMENT // THE DISCONNECT MEANS SPECIFIED IN SECTION 225.31 SHALL BE SUITABLE FOR USE AS SERVICE EQUIPMENT PER SECTION 225.36]
FOR GMA PROJECTS
- The wire from the inverter to the AC disconnect must also be sized to #6 Per SCE requirements, specify the distance from the GMA to the fused disconnect as 2-3' maximum
- Indicate that equipment grounding electrode conductor (EGC) shall be in separate conduit. The EGC is not installed in the liquid-tight flexible conduit from the AC disconnect
- GMA requires GEC to be run in its own conduit to MSP
- Label Page
ALL PROJECTS
- All 3 F.D. ELECTRICAL BLDG DISCONNECT placards are required on all jobs even if there is no battery install
FOR BATTERY PROJECTS
- CEC 705.12(B)(3): CAUTION TRI POWER SOURCE SECOND SOURCE IS AC BATTERY THIRD SOURCE IS PV INVERTER
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim