County of Los Angeles (Palmdale) (CA)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2022 CALIFORNIA BUILDING CODE 2022 CALIFORNIA ELECTRICAL CODE 2022 CALIFORNIA FIRE CODE 2022 CALIFORNIA PLUMBING CODE 2022 CALIFORNIA MECHANICAL CODE 2022 CALIFORNIA ENERGY CODE 2022 CALIFORNIA RESIDENTIAL CODE 2022 CALIFORNIA ADMINISTRATIVE CODE
- IEBC Accepted
- 1
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 999
- Snow Load Notes
* Elevations between 2000 and 3500 ft. require 20 psf snow load to be accounted for. * Elevations between 3500 and 5000 ft. require 40 psf snow load to be accounted for. * Elevations greater than 5000 ft. require 80 psf snow load to be accounted for. BCM1608 A1
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
SE digital stamps on corresponding pages, PE Letter & Calcs. For ballast mount projects use PZSE (contact ) for structural engineering ### Bus Certs are NOT accepted in this AHJ
- Minimum Ground On Roof
- #8
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 75
- De Rating Ampacity
- 0.96
Battery / ESS
- ESS Notes
[LACOF]
This AHJ follows County of Los Angeles (ESS Requirements) (CA).
Please follow this link to County of Los Angeles (ESS Requirements) (CA)
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Bus Certs are NOT accepted in this AHJ
- Roof Plan
For systems with multiple strings/inverters, the plans shall clearly identify how all modules are mapped to each string and/or inverter input
- Attachment Detail
Distance from top of module to roof is to be called out
- Electrical Diagram
FOR ALL PROJECTS Add Note: THE PV BREAKER SHALL BE LOCATED AT THE OPPOSITE END OF THE MAIN BREAKER OR INPUT FEEDER Add note "ALL TERMINALS TO BE RATED AT 75°C MINIMUM" Do not use 90°C ampacities/derate factors. Add Note: All electrical work shall be designed per 2020 Los Angeles County electrical code, 2019 California Electrical Code, and 2017 National Electrical Code. Add Note: 110.2 Approval: All electrical equipment shall be labeled, listed, or certified by a Nationally Recognized Testing Laboratory accredited by the United States Occupational Safety Health Administration. FOR MPU PROJECTS Add Note: GEC SIZE FROM MAIN SERVICE PANEL TO GROUND ROD TO BE #4 AWG. SIZE OF GEC FROM PANEL TO METAL WATER PIPE TO BE #4 AWG Add note: THE CONNECTION TO THE INTERIOR METAL WATER PIPING SHALL BE MADE WITHIN 5 FT FROM THE POINT OF ENTRANCE. PER SECTION 250.68(C)(1) Add note: COLD WATER WITHIN 5 FEET AND AT LEAST ONE SUPPLEMENTAL ELECTRODE ARE REQUIRED (2 ground rods at least 6' apart is 1 supplemental electrode) If ground rods, comply with the following: 250.53(A)(2) & (3) Resistance of Electrodes: For the ground rod specified on the single line diagram, indicate that there shall be two ground rods separated by six or more feet Add Note: GEC SIZE IS #4 AWG 1 GROUND ROD TO BE INSTALLED WITHING 5' OF COLD WATER MAIN ENTERING THE HOME, CONNECTED VIA UL LISTED BONDING CLAMP Identify if the main panel is fed via an overhead drop or underground feed. If overhead, provide the size of the service entrance conductors AND ground size (GEC) Identify GEC size to Table 250.66 Add Note: If proposed new main panel is located more than 6 feet from the existing main panel, combination-type AFCI breakers shall be used as a method of protection for all 15A/1P and 20A/1P (120V) loads per 210.12(D). If solar ready MPU: Show model number for solar ready service panels FOR HOT BUS PROJECTS If MSP is a hot bus and has 6 or less breakers, provide a panel schedule identifying all the breakers FOR GMA PROJECTS The wire from the inverter to the AC disconnect must also be sized to #6 Per SCE requirements, specify the distance from the GMA to the fused disconnect as 2-3' maximum Indicate that equipment grounding electrode conductor (EGC) shall be in separate conduit. The EGC is not installed in the liquid-tight flexible conduit from the AC disconnect to the GMA GMA requires GEC to be ran in its own conduit to MSP FOR BATTERY PROJECTS: Add Note: BACK UP LOAD CENTER WILL COMPLY WITH 210.12(A) USING AFCI BREAKERS Add Note: BOND GROUNDING SYSTEM IN BOTH BUILDINGS .NEUTRAL BUS AT SEPARATE BUILDING SHALL BE ISOLATED Add Note: THE SUB PANEL OR AC DISCONNECT SWITCH AT THE SEPARATE STRUCTURE SHALL BE SERVICE RATED 225.36 SUITABLE FOR SERVICE EQUIPMENT Add Note: THE DISCONNECT MEANS SPECIFIED IN SECTION 225.31 SHALL BE SUITABLE FOR USE AS SERVICE EQUIPMENT PER SECTION 225.36
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim