County of Los Angeles (Santa Clarita Valley) (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
2
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Per Elisabeth at Building and Safety, County follows most recent code for fire clearances (2018 mid-cycle code update)

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
999
Snow Load Notes

* Elevations between 2000 and 3500 ft. require 20 psf snow load to be accounted for. * Elevations between 3500 and 5000 ft. require 40 psf snow load to be accounted for. * Elevations greater than 5000 ft. require 80 psf snow load to be accounted for. BCM1608 A1

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

For ballast mount projects use PZSE (contact ) for structural engineering ### Bus Certs are NOT accepted in this AHJ

Minimum Ground On Roof
#8

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Load Side Taps,Meter Adapter,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
75
De Rating Ampacity
0.96

Battery / ESS

ESS Notes

[LACOF]

This AHJ follows County of Los Angeles (ESS Requirements) (CA).

Please follow this link to County of Los Angeles (ESS Requirements) (CA)

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc


12/28 label disconnects in elevation view

12/28 disconnect label must be as page 9 of lacofd guide, please see attached

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Cover Page
  • Address on plans must match address on utility bill exactly
Cover Page Notes

All Jobs [All work shall be in compliance with the most current Los Angeles County fire code and its sections] Battery [When ESS is installed inside garage, - Any planned or existing attached garage shall comply with all applicable codes and standards, and with the manufacturer's installation manual(s) to which the equipment has been listed, including requirements pertaining to fire protective features (E.g., gypsum board, doors, and ducts), and to alarm/detector devices // EXTERIOR ESS UNITS WILL NOT BE INSTALLED WITHIN 5' (IN ANY DIRECTION) OF ALL WINDOWS, DOORS, AND HVAC INLETS. ESS UNITS WILL BE INSTALLED NO LESS THAN 3' FROM OTHER ESS UNITS.]

Site

## **All Jobs** All buildings on property are to be properly labeled and called out as habitable or non-habitable. For systems with multiple strings, the plans shall clearly identify how all modules are mapped to each string and/or inverter output.

Site Notes

All Jobs [ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY ACCREDITED BY THE UNITED STATES OCCUPATIONAL SAFETY HEALTH ADMINISTRATION. // Project is NOT located in a fire hazard severity zone, nor in a state-responsibility area and is therefore exempt from the requirement per CRC R377.6.2 and CBC 706a.2 for securing mesh at the level of the underlayment or decking/sheathing, directly overt the vent opening through the decking/sheathing that is located at the ridge // 36 in wide emergency escape and rescue pathways will be provided to the center of the operable portions of all operable doors and windows located above the roof plane when a said door or window is both setback from the eave and serving a habitable space. Windows serving vaulted ceiling only shall be exempt. No electrical components associated with the battery integrated PV system shall be located above the roof decking for the full extent of these pathways. Compliance shall be subject to inspection by the fire code official as demonstrated by the lifting of tiles by responsible party as necessary for confirmation. (CFC 1204.2.2)] MPU [NEW SERVICE PANEL TO REPLACE EXISTING AT SAME LOCATION (Pending Utility company)]

Roof Plan
  • For systems with multiple strings/inverters, the plans shall clearly identify how all modules are mapped to each string and/or inverter input
Attachment Detail
  • Distance from top of module to roof is to be called out
Electrical Diagram

FOR ALL PROJECTS If the point of interconnection uses Section 705.12(b)(2)(3)(c), provide this note on the single line diagram: “These are the only circuit breakers in this panel at this time.” Do not use 90°C ampacities/derate factors. FOR MPU PROJECTS (2 ground rods at least 6' apart is 1 supplemental electrode) If ground rods, comply with the following: 250.53(A)(2) & (3) Resistance of Electrodes: For the ground rod specified on the single line diagram, indicate that there shall be two ground rods separated by six or more feet Identify if the main panel is fed via an overhead drop or underground feed. If overhead, provide the size of the service entrance conductors AND ground size (GEC) Identify GEC size to Table 250.66 If solar ready MPU: Show model number for solar ready service panels FOR HOT BUS PROJECTS If MSP is a hot bus and has 6 or less breakers, provide a panel schedule identifying all the breakers FOR GMA PROJECTS The wire from the inverter to the AC disconnect must also be sized to #6 Per SCE requirements, specify the distance from the GMA to the fused disconnect as 2-3' maximum Indicate that equipment grounding electrode conductor (EGC) shall be in separate conduit. The EGC is not installed in the liquid-tight flexible conduit from the AC disconnect to the GMA GMA requires GEC to be ran in its own conduit to MSP FOR Battery PROJECTS There shall be a shut off switch that is not located on the battery itself.

Electrical Diagram Notes

All Jobs [THE PV BREAKER SHALL BE LOCATED AT THE OPPOSITE END OF THE MAIN BREAKER OR INPUT FEEDER // ALL TERMINALS TO BE RATED AT 75°C MINIMUM // All electrical work shall be designed per 2020 Los Angeles County electrical code, 2019 California Electrical Code, and 2017 National Electrical Code. // 110.2 Approval: All electrical equipment shall be labeled, listed, or certified by a Nationally Recognized Testing Laboratory accredited by the United States Occupational Safety Health Administration.] MPU [GEC SIZE FROM MAIN SERVICE PANEL TO GROUND ROD TO BE #4 AWG. SIZE OF GEC FROM PANEL TO METAL WATER PIPE TO BE #4 AWG // THE CONNECTION TO THE INTERIOR METAL WATER PIPING SHALL BE MADE WITHIN 5 FT FROM THE POINT OF ENTRANCE. PER SECTION 250.68(C)(1) // COLD WATER WITHIN 5 FEET AND AT LEAST ONE SUPPLEMENTAL ELECTRODE ARE REQUIRED // GEC SIZE IS #4 AWG 1 GROUND ROD TO BE INSTALLED WITHING 5' OF COLD WATER MAIN ENTERING THE HOME, CONNECTED VIA UL LISTED BONDING CLAMP // If proposed new main panel is located more than 6 feet from the existingmain panel, combination-type AFCI breakers shall be used as a method of protection for all 15A/1P and 20A/1P (120V) loads per 210.12(D). ] Battery [BACK UP LOAD CENTER WILL COMPLY WITH 210.12(A) USING AFCI BREAKERS // BOND GROUNDING SYSTEM IN BOTH BUILDINGS .NEUTRAL BUS AT SEPARATE BUILDING SHALL BE ISOLATED // THE SUB PANEL OR AC DISCONNECT SWITCH AT THE SEPARATE STRUCTURE SHALL BE SERVICE RATED 225.36 SUITABLE FOR SERVICE EQUIPMENT // THE DISCONNECT MEANS SPECIFIED IN SECTION 225.31 SHALL BE SUITABLE FOR USE AS SERVICE EQUIPMENT PER SECTION 225.36 // At the gateway, remove the neutral-ground bonding strap. // Battery Installed 5 feet away from doors and windows // The ESS circuit breaker shall be secured by an additional fastener per section 408.36(D). The Breaker and fastener shall be made by the same manufacturer]

Label Page

Provide a label identifying the rapid shutdown initiation device per 690.56(C)(3). 690.56(C)(3) Rapid Shutdown Switch. A rapid shutdown switch shall have a label located on or no more than 1 m (3 ft) from the switch that includes the following wording “RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM”.

Custom Placards Required
1
Non Standard Planset Requirements
Single Line Diagram

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes

* The site plan must show any slopes within 40 ft of the ground mount system. Show on plans: ascending or descending slope, steepness of the slope, distance between the top of the slope to the module, and the overall height of the slope. * Specify if there is septic or not. If there is septic, show the distance from the modules. * Ground mount attachment details page must be site specific and specify 2500 psi minimum.

Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of Los Angeles (Santa Clarita Valley) (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.