County of Mariposa (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
3
Revision Required
0
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
No
Stamp Location On Plans
Top Right
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
120
Wind Notes

Exposure Category C

Snow Load
999
Snow Load Notes

Call County with the APN # to find out what the snow load is. Varies depending on area. "Ground snow load in Mariposa County is generally determined by elevation. Please call the office with an APN# and address and we can provide you with an approximate ground snow load. Per CRC R301.2.3 **any site that has a ground snow load greater than 70 lbs. per square foot shall require engineering.** " Every parcel in Mariposa County has a ground snow load

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes
No PE required
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements


Cover Page

Call out the snow load and wind speed for the project

Site
  • If trenching, request septic mapping ahead of plans build
Electrical Diagram

Regarding Generators, if the customer has or will have a generator: Inspector at AHJ (Justin) said that they require permits for generator and must be shown on electrical diagram. They also require transfer switch, either manual or automatic.

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes

GROUNDMOUNT Requirements Per Correction on Project a past project:

  • Footings must be 10 feet from septic leach lines (per correction).
  • Setbacks: 25' on all sides; 55' from the centerline of roads (per Kaitlyn at the AHJ).

Site Plan must include:

  • Parcel map
  • All existing buildings and septic system
  • Identification of the structure we’re installing solar on
  • Identification of the structure we’re interconnecting into
  • All structures on the parcel clearly labeled


Setback Front Yard
1
Setback Back Yard
1
Setback Side Yard
1
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of Mariposa (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.